Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting equipment for eave drainage channel of steel structure building
Steel structure building eave drainage channel installation equipment comprises two stand columns, a working platform capable of ascending and descending in the vertical direction is connected between the two stand columns, a moving platform capable of moving on the horizontal plane is arranged on the working platform, and a storage mechanism used for storing a drainage channel to be installed is arranged on the moving platform. The storage mechanism is connected with a grabbing mechanism used for grabbing the drainage channel to be installed in the storage mechanism, and through the working platform arranged between the stand columns, when a worker installs the drainage channel, the worker stands on the working platform and ascends to the position where the drainage channel can be installed along with the working platform to conduct installation work of the drainage channel; and the risk caused by unstable gravity center due to the fact that the worker stands on the cutting inclined plane is avoided, and the safety of the worker during operation is improved.
一种钢结构建筑屋檐排水槽安装设备,包括两个立柱,两个立柱之间连接有能够在竖直方向上升降的工作平台,工作平台上设置有能够在水平面上移动的移动平台,移动平台上设有用于存储待安装排水槽的存储机构,存储机构连接有用于将存储机构内待安装排水槽抓取的抓取机构,通过在立柱间设置的工作平台,工作人员在安装排水槽时,站立在工作平台上随工作平台上升至能够安装排水槽的位置进行排水槽的安装工作,避免了工作人员站立在切斜面上造成重心不稳而导致的风险,提高了工作人员作业时的安全性。
Mounting equipment for eave drainage channel of steel structure building
Steel structure building eave drainage channel installation equipment comprises two stand columns, a working platform capable of ascending and descending in the vertical direction is connected between the two stand columns, a moving platform capable of moving on the horizontal plane is arranged on the working platform, and a storage mechanism used for storing a drainage channel to be installed is arranged on the moving platform. The storage mechanism is connected with a grabbing mechanism used for grabbing the drainage channel to be installed in the storage mechanism, and through the working platform arranged between the stand columns, when a worker installs the drainage channel, the worker stands on the working platform and ascends to the position where the drainage channel can be installed along with the working platform to conduct installation work of the drainage channel; and the risk caused by unstable gravity center due to the fact that the worker stands on the cutting inclined plane is avoided, and the safety of the worker during operation is improved.
一种钢结构建筑屋檐排水槽安装设备,包括两个立柱,两个立柱之间连接有能够在竖直方向上升降的工作平台,工作平台上设置有能够在水平面上移动的移动平台,移动平台上设有用于存储待安装排水槽的存储机构,存储机构连接有用于将存储机构内待安装排水槽抓取的抓取机构,通过在立柱间设置的工作平台,工作人员在安装排水槽时,站立在工作平台上随工作平台上升至能够安装排水槽的位置进行排水槽的安装工作,避免了工作人员站立在切斜面上造成重心不稳而导致的风险,提高了工作人员作业时的安全性。
Mounting equipment for eave drainage channel of steel structure building
一种钢结构建筑屋檐排水槽安装设备
CHEN MAOHUI (Autor:in) / WANG XIAOBO (Autor:in) / SUN PENG (Autor:in)
22.03.2024
Patent
Elektronische Ressource
Chinesisch
EAVE SOFFIT PANEL, EAVE SOFFIT STRUCTURE, BUILDING AND EAVE SOFFIT PANEL INSTALLING METHOD
Europäisches Patentamt | 2017
|Building eave drainage channel capable of preventing water flooding and scouring
Europäisches Patentamt | 2021
|