Rapid assembly type construction method for corrugated steel web composite beam bridge top plate
The invention discloses a rapid assembly type construction method for a corrugated steel web composite beam bridge top plate, which comprises the following steps of: pre-binding reinforcing steel bars and pre-burying prestressed pipelines on a jig frame, hanging a truss by using a steel wire rope through an intelligent crane, sliding and rotating to the middle part of an upper flange construction section of a corrugated steel web at a suspended pouring section; integrally hoisting the jig frame and the top plate frame to a specified position of a non-constructed top plate section; through mutual cooperation of the truss and the walking type jig frame, the problem of integral hoisting of the large-area top plate frame is solved, the hoisting and transferring process is stable and safe, the top plate construction time can be shortened, the construction safety is improved, and standardized operation of the top plate frame is achieved.
本发明公开了一种波形钢腹板组合梁桥顶板快速装配式施工方法,胎架预绑扎钢筋和预埋预应力管道,通过智能吊机利用钢丝绳垂吊桁架,滑移并旋转至悬浇段波纹钢腹板上翼缘施工节段中部,再将胎架和顶板框架整体吊装到指定的未施工顶板节段位置;本发明通过桁架和行走式胎架的相互配合,解决了大面积顶板框架整体吊装的难题,吊装转移过程平稳安全,可减少顶板施工时间,提高施工安全,实现顶板框架标准化作业等优点。
Rapid assembly type construction method for corrugated steel web composite beam bridge top plate
The invention discloses a rapid assembly type construction method for a corrugated steel web composite beam bridge top plate, which comprises the following steps of: pre-binding reinforcing steel bars and pre-burying prestressed pipelines on a jig frame, hanging a truss by using a steel wire rope through an intelligent crane, sliding and rotating to the middle part of an upper flange construction section of a corrugated steel web at a suspended pouring section; integrally hoisting the jig frame and the top plate frame to a specified position of a non-constructed top plate section; through mutual cooperation of the truss and the walking type jig frame, the problem of integral hoisting of the large-area top plate frame is solved, the hoisting and transferring process is stable and safe, the top plate construction time can be shortened, the construction safety is improved, and standardized operation of the top plate frame is achieved.
本发明公开了一种波形钢腹板组合梁桥顶板快速装配式施工方法,胎架预绑扎钢筋和预埋预应力管道,通过智能吊机利用钢丝绳垂吊桁架,滑移并旋转至悬浇段波纹钢腹板上翼缘施工节段中部,再将胎架和顶板框架整体吊装到指定的未施工顶板节段位置;本发明通过桁架和行走式胎架的相互配合,解决了大面积顶板框架整体吊装的难题,吊装转移过程平稳安全,可减少顶板施工时间,提高施工安全,实现顶板框架标准化作业等优点。
Rapid assembly type construction method for corrugated steel web composite beam bridge top plate
一种波形钢腹板组合梁桥顶板快速装配式施工方法
HUANG LIYOU (Autor:in) / LEI JIE (Autor:in) / LUO ZHILIN (Autor:in) / TAN HAITAO (Autor:in) / QIN ZHIYONG (Autor:in) / TANG JIANJUN (Autor:in) / ZHAO CHENGXUN (Autor:in) / WEI LONGHUA (Autor:in) / HE JIEHUA (Autor:in) / LUO YINGCHUN (Autor:in)
26.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2021
|Corrugated Steel Plate Web-PSC beam And Bridge Construction Method Thereof
Europäisches Patentamt | 2018
Corrugated Steel Plate Web-PSC beam And Bridge Construction Method Thereof
Europäisches Patentamt | 2017
|Prefabricated corrugated steel web composite beam bridge and construction method thereof
Europäisches Patentamt | 2021
|