Transmission tower foundation leveling device
The invention provides a power transmission tower foundation leveling device, which belongs to the technical field of power transmission towers, and comprises a power transmission tower leveling foundation, a hydraulic adjusting system, a leveling cushion block and a bearing base, comprising four horizontally fixed inner ring cross beams, four horizontally fixed outer ring cross beams and four vertically fixed modulation bases, the number of the hydraulic adjusting systems is eight. Each hydraulic adjusting system comprises an upper hydraulic cylinder base, an upper cross universal joint, a hydraulic cylinder, a lower cross universal joint and a lower hydraulic cylinder base from top to bottom. The leveling cushion blocks are I-shaped, the number of the leveling cushion blocks is eight, every two leveling cushion blocks form a pair, the upper surfaces of each pair of leveling cushion blocks are fixedly connected with a modulation base of the leveling foundation of the transmission tower through bolts, and the lower surfaces of each pair of leveling cushion blocks are fixedly connected with the upper surface of the bearing base through bolts; the upper surfaces of the four modulation bases are fixedly connected with four bases of the power transmission tower through gaskets.
本发明提供了一种输电杆塔基础调平装置,属于输电杆塔技术领域,包括输电杆塔调平基础、液压调节系统、调平垫块和承重底座,其中,输电杆塔调平基础为正方形,包括4个水平固定的内圈横梁、4个水平固定的外圈横梁以及4个竖直固定的调制底座;液压调节系统为8个,液压调节系统自上而下包括上液压缸底座、上十字万向节、液压缸、下十字万向节以及下液压缸底座;调平垫块为工字形,调平垫块为8个,每两个调平垫块为一对,每对调平垫块的上表面通过螺栓与输电杆塔调平基础的调制底座固定连接,下表面通过螺栓与承重底座的上表面固定连接;4个调制底座的上表面通过垫片与输电杆塔的4个基座固定连接。
Transmission tower foundation leveling device
The invention provides a power transmission tower foundation leveling device, which belongs to the technical field of power transmission towers, and comprises a power transmission tower leveling foundation, a hydraulic adjusting system, a leveling cushion block and a bearing base, comprising four horizontally fixed inner ring cross beams, four horizontally fixed outer ring cross beams and four vertically fixed modulation bases, the number of the hydraulic adjusting systems is eight. Each hydraulic adjusting system comprises an upper hydraulic cylinder base, an upper cross universal joint, a hydraulic cylinder, a lower cross universal joint and a lower hydraulic cylinder base from top to bottom. The leveling cushion blocks are I-shaped, the number of the leveling cushion blocks is eight, every two leveling cushion blocks form a pair, the upper surfaces of each pair of leveling cushion blocks are fixedly connected with a modulation base of the leveling foundation of the transmission tower through bolts, and the lower surfaces of each pair of leveling cushion blocks are fixedly connected with the upper surface of the bearing base through bolts; the upper surfaces of the four modulation bases are fixedly connected with four bases of the power transmission tower through gaskets.
本发明提供了一种输电杆塔基础调平装置,属于输电杆塔技术领域,包括输电杆塔调平基础、液压调节系统、调平垫块和承重底座,其中,输电杆塔调平基础为正方形,包括4个水平固定的内圈横梁、4个水平固定的外圈横梁以及4个竖直固定的调制底座;液压调节系统为8个,液压调节系统自上而下包括上液压缸底座、上十字万向节、液压缸、下十字万向节以及下液压缸底座;调平垫块为工字形,调平垫块为8个,每两个调平垫块为一对,每对调平垫块的上表面通过螺栓与输电杆塔调平基础的调制底座固定连接,下表面通过螺栓与承重底座的上表面固定连接;4个调制底座的上表面通过垫片与输电杆塔的4个基座固定连接。
Transmission tower foundation leveling device
一种输电杆塔基础调平装置
CAO KAI (Autor:in) / WU JIANNING (Autor:in) / LU YUAN (Autor:in) / MA YUHUI (Autor:in) / WANG XUAN (Autor:in) / PANG XIAOLONG (Autor:in) / BAI LU (Autor:in) / PAN WEIFENG (Autor:in) / ZHANG WEI (Autor:in) / REN DAJIANG (Autor:in)
26.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Transmission tower foundation leveling device and method
Europäisches Patentamt | 2024
|Offshore wind power tower drum foundation with rapid leveling structure
Europäisches Patentamt | 2024
|Underwater riprap foundation bed leveling device and leveling method