Pushing system of newly-built station building structure
According to the pushing system of the newly-built station building structure, a connecting structure between a transfer channel and a waiting layer truss and a connecting structure between the transfer channel and an overbridge structure comprise a temporary hinge seat, a first connecting rod, a second connecting rod, a third connecting rod, a fourth connecting rod, a fifth connecting rod and a sixth connecting rod, the center plate slides on the base body between the two limiting columns, and the limiting columns are fixed to the base body. The movable body is arranged between the two limiting columns, a vertical through flat groove is formed in the vertical center face of the movable body, and the center plate is located in the flat groove; the position of the movable body is allowed to change between the limiting columns of the temporary hinge seat, and the position of the movable body is also allowed to change along the center plate. According to the technical scheme, it is guaranteed that the large-span newly-built station building structure is smoothly pushed to the target position in large pushing displacement.
本申请提供的新建站房结构的顶推系统,其中所述换乘通道和所述候车层桁架之间、所述换乘通道和天桥结构之间的连接结构包含:临时铰接座,包含中心板和相对所述中心板所在平面对称的两个限位柱,所述中心板在两个所述限位柱之间在基体上滑动,所述限位柱固定于所述基体;活动体,设于两个所述限位柱之间,并且所述活动体的竖向中心面处开设竖向贯通的扁槽,所述中心板位于所述扁槽内;所述活动体的位置允许在临时铰接座的限位柱之间变动,所述活动体的位置也允许沿所述中心板变动。通过上述技术方案本申请保证了大跨度的新建站房结构在较大的顶推位移中顺利地被顶推到目标位置。
Pushing system of newly-built station building structure
According to the pushing system of the newly-built station building structure, a connecting structure between a transfer channel and a waiting layer truss and a connecting structure between the transfer channel and an overbridge structure comprise a temporary hinge seat, a first connecting rod, a second connecting rod, a third connecting rod, a fourth connecting rod, a fifth connecting rod and a sixth connecting rod, the center plate slides on the base body between the two limiting columns, and the limiting columns are fixed to the base body. The movable body is arranged between the two limiting columns, a vertical through flat groove is formed in the vertical center face of the movable body, and the center plate is located in the flat groove; the position of the movable body is allowed to change between the limiting columns of the temporary hinge seat, and the position of the movable body is also allowed to change along the center plate. According to the technical scheme, it is guaranteed that the large-span newly-built station building structure is smoothly pushed to the target position in large pushing displacement.
本申请提供的新建站房结构的顶推系统,其中所述换乘通道和所述候车层桁架之间、所述换乘通道和天桥结构之间的连接结构包含:临时铰接座,包含中心板和相对所述中心板所在平面对称的两个限位柱,所述中心板在两个所述限位柱之间在基体上滑动,所述限位柱固定于所述基体;活动体,设于两个所述限位柱之间,并且所述活动体的竖向中心面处开设竖向贯通的扁槽,所述中心板位于所述扁槽内;所述活动体的位置允许在临时铰接座的限位柱之间变动,所述活动体的位置也允许沿所述中心板变动。通过上述技术方案本申请保证了大跨度的新建站房结构在较大的顶推位移中顺利地被顶推到目标位置。
Pushing system of newly-built station building structure
新建站房结构的顶推系统
WANG SHUO (Autor:in) / LIU JUNLONG (Autor:in) / SHI NIANJIA (Autor:in) / WAN MING (Autor:in) / GUO WEIWEI (Autor:in) / GONG SHUICAI (Autor:in) / YUAN WENKUI (Autor:in) / GUO XIBIN (Autor:in) / SUN YUGANG (Autor:in) / HE MIN (Autor:in)
26.03.2024
Patent
Elektronische Ressource
Chinesisch
Connecting structure of existing building and newly-built building and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Newly-built curtain wall system of existing building and construction method thereof
Europäisches Patentamt | 2022
|