Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipe gallery top plate secondary construction pre-coating fixing structure and construction method
The invention relates to the field of road and bridge construction, in particular to a pre-coating layer fixing structure for secondary construction of a pipe gallery roof and a construction method.The pre-coating layer fixing structure comprises a plurality of protection strips, each protection strip comprises a protection strip body and a connecting part arranged at the edge of the protection strip body, and the adjacent protection strips are connected in an overlapped mode or spliced at the positions of the connecting parts; the protection strips are spliced to form a pre-coating layer; and the connecting parts are arranged in such a way and can be damaged by water immersion, so that when the connecting parts can be adhered to the coiled material and/or the connecting parts of the adjacent protective strips, the connecting parts can be damaged by water immersion and fail, and the protective strips can be separated from the coiled material and the adjacent protective strips at the corresponding positions. The protective strip is connected to the coiled material through the connecting part capable of being damaged by water immersion, effective protection can be achieved during steel bar binding construction, the steel bars are easy to take out after binding construction, and the problems existing in the prior art are effectively solved.
本发明涉及路桥施工领域,尤其涉及一种管廊顶板二次施工预覆层固定结构及施工方法,预覆层固定结构包括多个防护条,防护条包括防护条本体、设置在防护条本体边缘的连接部,相邻防护条在连接部位置叠合连接或者拼接,以使得各防护条拼接形成预覆层;其中,连接部如此设置,连接部能够浸水破坏,以使得连接部能够粘结在卷材和/或相邻防护条的连接部时,连接部能够水浸破坏失效,防护条能够与对应位置卷材、相邻防护条分离。本发明通过采用能够水浸破坏的连接部将防护条连接在卷材处,能够在钢筋捆扎施工时有效防护,在钢筋捆扎施工后还易于取出,有效的解决了现有技术中存在的问题。
Pipe gallery top plate secondary construction pre-coating fixing structure and construction method
The invention relates to the field of road and bridge construction, in particular to a pre-coating layer fixing structure for secondary construction of a pipe gallery roof and a construction method.The pre-coating layer fixing structure comprises a plurality of protection strips, each protection strip comprises a protection strip body and a connecting part arranged at the edge of the protection strip body, and the adjacent protection strips are connected in an overlapped mode or spliced at the positions of the connecting parts; the protection strips are spliced to form a pre-coating layer; and the connecting parts are arranged in such a way and can be damaged by water immersion, so that when the connecting parts can be adhered to the coiled material and/or the connecting parts of the adjacent protective strips, the connecting parts can be damaged by water immersion and fail, and the protective strips can be separated from the coiled material and the adjacent protective strips at the corresponding positions. The protective strip is connected to the coiled material through the connecting part capable of being damaged by water immersion, effective protection can be achieved during steel bar binding construction, the steel bars are easy to take out after binding construction, and the problems existing in the prior art are effectively solved.
本发明涉及路桥施工领域,尤其涉及一种管廊顶板二次施工预覆层固定结构及施工方法,预覆层固定结构包括多个防护条,防护条包括防护条本体、设置在防护条本体边缘的连接部,相邻防护条在连接部位置叠合连接或者拼接,以使得各防护条拼接形成预覆层;其中,连接部如此设置,连接部能够浸水破坏,以使得连接部能够粘结在卷材和/或相邻防护条的连接部时,连接部能够水浸破坏失效,防护条能够与对应位置卷材、相邻防护条分离。本发明通过采用能够水浸破坏的连接部将防护条连接在卷材处,能够在钢筋捆扎施工时有效防护,在钢筋捆扎施工后还易于取出,有效的解决了现有技术中存在的问题。
Pipe gallery top plate secondary construction pre-coating fixing structure and construction method
一种管廊顶板二次施工预覆层固定结构及施工方法
YU QINPENG (Autor:in) / QIN BING (Autor:in) / LIU JIANCAO (Autor:in) / SONG KUN (Autor:in) / CAO YONGLE (Autor:in)
29.03.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Construction method for partition plate in pipe gallery
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2016
|