Underwater concrete pouring construction method
The underwater concrete pouring construction method comprises the steps that an underwater concrete pouring distribution structure is constructed, a supporting protection frame protects a rock mass caving object, and two sets of supporting sleeve assemblies keep the positions of the two opposite sides of a supporting pipeline stable on the supporting protection frame. A guardrail B of the supporting protection frame is located on the top construction side of a pile hole with a rock mass caving object, a guardrail A of the supporting protection frame is located on the top construction side of the pile hole needing to be opened frequently, and telescopic rods of the two sets of supporting sleeve assemblies drive two arc-shaped sleeves to support the two opposite sides of a supporting pipeline. The problem that a supporting frame cannot prevent rock mass collapsing objects from falling into a pile hole to affect the pouring quality is solved.
本申请公开了一种水下混凝土灌注施工方法,包括:构建水下混凝土灌注分布结构,支撑防护架对岩体塌落物进行防护,两组支撑套组件在支撑防护架上对支撑管道相对两侧起到保持位置稳定。支撑防护架的护栏B处于有岩体塌落物的桩孔顶部施工侧,支撑防护架的护栏A处于要经常打开的桩孔顶部施工侧,两组支撑套组件的伸缩杆带着两个弧形套对支撑管道相对两侧进行支撑,解决了支撑架不能起到防止岩体塌落物落入桩孔影响浇筑质量的问题。
Underwater concrete pouring construction method
The underwater concrete pouring construction method comprises the steps that an underwater concrete pouring distribution structure is constructed, a supporting protection frame protects a rock mass caving object, and two sets of supporting sleeve assemblies keep the positions of the two opposite sides of a supporting pipeline stable on the supporting protection frame. A guardrail B of the supporting protection frame is located on the top construction side of a pile hole with a rock mass caving object, a guardrail A of the supporting protection frame is located on the top construction side of the pile hole needing to be opened frequently, and telescopic rods of the two sets of supporting sleeve assemblies drive two arc-shaped sleeves to support the two opposite sides of a supporting pipeline. The problem that a supporting frame cannot prevent rock mass collapsing objects from falling into a pile hole to affect the pouring quality is solved.
本申请公开了一种水下混凝土灌注施工方法,包括:构建水下混凝土灌注分布结构,支撑防护架对岩体塌落物进行防护,两组支撑套组件在支撑防护架上对支撑管道相对两侧起到保持位置稳定。支撑防护架的护栏B处于有岩体塌落物的桩孔顶部施工侧,支撑防护架的护栏A处于要经常打开的桩孔顶部施工侧,两组支撑套组件的伸缩杆带着两个弧形套对支撑管道相对两侧进行支撑,解决了支撑架不能起到防止岩体塌落物落入桩孔影响浇筑质量的问题。
Underwater concrete pouring construction method
一种水下混凝土灌注施工方法
LIANG GUANGYAO (Autor:in) / ZHU YINGJUN (Autor:in) / HE SHU (Autor:in) / FANG TENGXIAO (Autor:in) / WEI HE (Autor:in) / ZHOU HUIKAI (Autor:in) / ZOU HUAIMING (Autor:in) / XIE CHENGTAO (Autor:in) / HUANG ZHUJUN (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underwater concrete pouring device and underwater concrete pouring method
Europäisches Patentamt | 2024
|Underwater runway concrete pouring construction method
Europäisches Patentamt | 2022
|Underwater concrete pouring system and construction method
Europäisches Patentamt | 2024
|