Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation pit foundation reinforcing structure under complex working conditions and construction method thereof
The invention relates to the technical field of foundation pit foundation reinforcement, in particular to a foundation pit foundation reinforcement structure under complex working conditions and a construction method thereof.The foundation pit foundation reinforcement structure comprises a structural frame with a containing groove penetrating through the front end face and the rear end face of the structural frame, and a plurality of triangular cavity plates are arranged in the containing groove in a linear array mode; a mounting carrier is fixedly mounted on the upper end face of the structural frame through arranged positioning pins, and a mounting mechanism is arranged on the mounting carrier. A supporting structure formed by the structural frame and the triangular cavity plate is in full contact with a soft soil layer, a firm supporting structure can be formed in the soft soil layer, the inserted triangular cavity plate is hammered, the overall stability of a soil body is improved, settlement and deformation of the soil body are reduced, and supporting is provided for stability of a foundation; and the structure frame and the triangular cavity plate can be automatically spliced and butted, so that the working efficiency is improved, meanwhile, the situation that the life safety of workers is endangered due to improper operation is avoided, and the safety of constructors and surrounding buildings is guaranteed.
本发明涉及基坑基础加固技术领域,具体为一种复杂工况下基坑基础加固结构及其施工方法,包括带有贯穿结构架前后端面放置槽的结构架,所述放置槽内以线性阵列方式设置有若干三角空腔板,所述结构架上端面通过设置的定位销固定安装有安装载架,所述安装载架上设置有安装机构。使得结构架与三角空腔板构成的支撑结构和软弱土层充分接触,能够在软弱土层内形成坚固的支撑结构,并且锤击插入的三角空腔板,提高土体的整体稳定性,减少土体的沉降和变形,为地基的稳固提供支撑,并且可自动对结构架与三角空腔板进行拼装和对接操作,从而提升工作效率,同时避免发生不当操作危及工人生命安全的情况,保证施工人员与周围建筑的安全。
Foundation pit foundation reinforcing structure under complex working conditions and construction method thereof
The invention relates to the technical field of foundation pit foundation reinforcement, in particular to a foundation pit foundation reinforcement structure under complex working conditions and a construction method thereof.The foundation pit foundation reinforcement structure comprises a structural frame with a containing groove penetrating through the front end face and the rear end face of the structural frame, and a plurality of triangular cavity plates are arranged in the containing groove in a linear array mode; a mounting carrier is fixedly mounted on the upper end face of the structural frame through arranged positioning pins, and a mounting mechanism is arranged on the mounting carrier. A supporting structure formed by the structural frame and the triangular cavity plate is in full contact with a soft soil layer, a firm supporting structure can be formed in the soft soil layer, the inserted triangular cavity plate is hammered, the overall stability of a soil body is improved, settlement and deformation of the soil body are reduced, and supporting is provided for stability of a foundation; and the structure frame and the triangular cavity plate can be automatically spliced and butted, so that the working efficiency is improved, meanwhile, the situation that the life safety of workers is endangered due to improper operation is avoided, and the safety of constructors and surrounding buildings is guaranteed.
本发明涉及基坑基础加固技术领域,具体为一种复杂工况下基坑基础加固结构及其施工方法,包括带有贯穿结构架前后端面放置槽的结构架,所述放置槽内以线性阵列方式设置有若干三角空腔板,所述结构架上端面通过设置的定位销固定安装有安装载架,所述安装载架上设置有安装机构。使得结构架与三角空腔板构成的支撑结构和软弱土层充分接触,能够在软弱土层内形成坚固的支撑结构,并且锤击插入的三角空腔板,提高土体的整体稳定性,减少土体的沉降和变形,为地基的稳固提供支撑,并且可自动对结构架与三角空腔板进行拼装和对接操作,从而提升工作效率,同时避免发生不当操作危及工人生命安全的情况,保证施工人员与周围建筑的安全。
Foundation pit foundation reinforcing structure under complex working conditions and construction method thereof
一种复杂工况下基坑基础加固结构及其施工方法
ZHAN ZHIMING (Autor:in) / YUAN FENFANG (Autor:in) / WU WENTING (Autor:in) / YI WENXIONG (Autor:in) / REN YANPING (Autor:in) / LIAO YI (Autor:in) / QU ZOUXIANG (Autor:in) / ZHOU YIFAN (Autor:in) / TAN LUOYI (Autor:in) / FANG RONG (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soft foundation building foundation reinforcing structure and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2018
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Foundation reinforcing device and construction method thereof
Europäisches Patentamt | 2023
|