Assembly method for pile fixing chamber of offshore wind power platform
The invention discloses an assembling method for a pile fixing chamber of an offshore wind power platform, and relates to the technical field of offshore wind power platform manufacturing. In the invention, as the main stress structure of the pile fixing frame is arranged at the upper end of the pile fixing frame in the height direction, in order to ensure that the upper end structure of the pile fixing frame is in a good mounting condition, a top plate is adopted as a bed mould for reverse construction during segmented construction, and the pile fixing chamber is hoisted and turned over after construction is completed, so that the assembly precision is ensured; the fixed ring beam, the movable ring beam and the pile fixing frame are built at the segmented stations, assembled at the final assembly station and then integrally hoisted to the main deck to be assembled, the defects that the operation is difficult and the assembly period is long due to the fact that the fixed ring beam, the movable ring beam and the pile fixing frame are installed step by step from bottom to top according to the assembly sequence are overcome, the assembly speed is greatly increased, and the assembly period is shortened. The dock utilization rate is improved.
一种海上风电平台固桩室的装配方法,涉及海上风电平台制造技术领域。本发明中,由于固桩架主要受力结构在其高度方向上端,为了保证固桩架上端结构处于良好的安装条件,故在分段建造时采用以顶板为胎板反向建造,完工后再将固桩室进行吊装翻身,保证了装配精度;定环梁、动环梁和固桩架在分段工位建造,在总装工位装配,然后再整体吊装至主甲板上进行装配,解决了原有的自下而上按照装配顺序一步一步安装的操作困难、装配周期长的缺点,本发明大大提高了装配速度,缩短了装配周期,提高了船坞利用率。
Assembly method for pile fixing chamber of offshore wind power platform
The invention discloses an assembling method for a pile fixing chamber of an offshore wind power platform, and relates to the technical field of offshore wind power platform manufacturing. In the invention, as the main stress structure of the pile fixing frame is arranged at the upper end of the pile fixing frame in the height direction, in order to ensure that the upper end structure of the pile fixing frame is in a good mounting condition, a top plate is adopted as a bed mould for reverse construction during segmented construction, and the pile fixing chamber is hoisted and turned over after construction is completed, so that the assembly precision is ensured; the fixed ring beam, the movable ring beam and the pile fixing frame are built at the segmented stations, assembled at the final assembly station and then integrally hoisted to the main deck to be assembled, the defects that the operation is difficult and the assembly period is long due to the fact that the fixed ring beam, the movable ring beam and the pile fixing frame are installed step by step from bottom to top according to the assembly sequence are overcome, the assembly speed is greatly increased, and the assembly period is shortened. The dock utilization rate is improved.
一种海上风电平台固桩室的装配方法,涉及海上风电平台制造技术领域。本发明中,由于固桩架主要受力结构在其高度方向上端,为了保证固桩架上端结构处于良好的安装条件,故在分段建造时采用以顶板为胎板反向建造,完工后再将固桩室进行吊装翻身,保证了装配精度;定环梁、动环梁和固桩架在分段工位建造,在总装工位装配,然后再整体吊装至主甲板上进行装配,解决了原有的自下而上按照装配顺序一步一步安装的操作困难、装配周期长的缺点,本发明大大提高了装配速度,缩短了装配周期,提高了船坞利用率。
Assembly method for pile fixing chamber of offshore wind power platform
一种海上风电平台固桩室的装配方法
LI JIANBO (Autor:in) / ZHAO SHI (Autor:in) / CHEN GEXIN (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Pile fixing frame for offshore wind power installation operation platform
Europäisches Patentamt | 2023
|Assembly type high-pile bearing platform for offshore wind power
Europäisches Patentamt | 2021
|Pile fixing system for wind power installation platform
Europäisches Patentamt | 2020
|Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
Europäisches Patentamt | 2024
|Pile machine for offshore wind power floating type pile stabilizing platform construction
Europäisches Patentamt | 2023
|