Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Basement construction method facilitating main body column construction
The invention relates to the technical field of basement construction, and discloses a basement construction method convenient for main body column construction, which comprises the following steps: 1) excavating a foundation pit in a construction site, arranging a beam bottom position where a support beam needs to be arranged in the foundation pit, and constructing the support beam at the beam bottom position when the foundation pit is excavated to the beam bottom position, the supporting beam is provided with a conflict position which longitudinally conflicts with the main body column, and the conflict position is provided with a vertically-through hole; (2) the foundation pit continues to be excavated till the pit bottom of the foundation pit is reached; (3) a basement bottom plate is constructed at the pit bottom of the foundation pit, and a basement outer wall is constructed on the periphery of the foundation pit; (4) a main body column is constructed in the foundation pit, and the main body column penetrates through the hole; and (5) a basement and a support changing structure are constructed, and after the basement and the support changing structure are constructed, the supporting beams are dismantled. Therefore, conflict between the main body column and the supporting beam is avoided, and smooth construction of the supporting structure is guaranteed.
本发明涉及地下室施工的技术领域,公开了便于主体柱施工的地下室施工方法,包括以下步骤:1)、在施工场地开挖基坑,基坑中具有需要布置支撑梁的梁底位置,当基坑开挖至梁底位置时,在梁底位置施工支撑梁,支撑梁具有与主体柱纵向冲突的冲突位,冲突位设有上下贯通的孔洞;2)、继续开挖基坑,直至到达基坑的坑底;3)、在基坑的坑底施工地下室底板,在基坑的外周施工地下室外墙;4)、在基坑中施工主体柱,主体柱穿过孔洞;5)、施工地下室以及换撑结构,待地下室以及换撑结构施工完毕后,拆除支撑梁。这样,避免主体柱与支撑梁冲突,保证支撑结构的顺利施工。
Basement construction method facilitating main body column construction
The invention relates to the technical field of basement construction, and discloses a basement construction method convenient for main body column construction, which comprises the following steps: 1) excavating a foundation pit in a construction site, arranging a beam bottom position where a support beam needs to be arranged in the foundation pit, and constructing the support beam at the beam bottom position when the foundation pit is excavated to the beam bottom position, the supporting beam is provided with a conflict position which longitudinally conflicts with the main body column, and the conflict position is provided with a vertically-through hole; (2) the foundation pit continues to be excavated till the pit bottom of the foundation pit is reached; (3) a basement bottom plate is constructed at the pit bottom of the foundation pit, and a basement outer wall is constructed on the periphery of the foundation pit; (4) a main body column is constructed in the foundation pit, and the main body column penetrates through the hole; and (5) a basement and a support changing structure are constructed, and after the basement and the support changing structure are constructed, the supporting beams are dismantled. Therefore, conflict between the main body column and the supporting beam is avoided, and smooth construction of the supporting structure is guaranteed.
本发明涉及地下室施工的技术领域,公开了便于主体柱施工的地下室施工方法,包括以下步骤:1)、在施工场地开挖基坑,基坑中具有需要布置支撑梁的梁底位置,当基坑开挖至梁底位置时,在梁底位置施工支撑梁,支撑梁具有与主体柱纵向冲突的冲突位,冲突位设有上下贯通的孔洞;2)、继续开挖基坑,直至到达基坑的坑底;3)、在基坑的坑底施工地下室底板,在基坑的外周施工地下室外墙;4)、在基坑中施工主体柱,主体柱穿过孔洞;5)、施工地下室以及换撑结构,待地下室以及换撑结构施工完毕后,拆除支撑梁。这样,避免主体柱与支撑梁冲突,保证支撑结构的顺利施工。
Basement construction method facilitating main body column construction
便于主体柱施工的地下室施工方法
JI TINGTING (Autor:in) / CHENG LEI (Autor:in) / SHI YANGHAI (Autor:in) / WANG XIAOHU (Autor:in) / LI KELONG (Autor:in) / WANG XIANNENG (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Basement steel column construction device and construction method
Europäisches Patentamt | 2024
|Construction method of medical linear accelerator connected with basement main body
Europäisches Patentamt | 2023
|Synchronous construction method of basement with underground continuous wall and main body
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2020
|