Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pit edge foundation settlement monitoring device
The invention relates to the technical field of constructional engineering, in particular to a pit side foundation settlement monitoring device which comprises a pile body, a monitoring assembly and a measuring mark, the monitoring assembly further comprises a plurality of connecting rods and monitoring rings which are alternately and rigidly connected, the pile body is inserted in the position of an elevation datum point, and the connecting rods and the monitoring rings extend in the direction perpendicular to the pile body. In order to prevent the influence of the surrounding environment, a middle rod is arranged in the monitoring ring, the trigger switch is arranged on the middle rod, the measuring mark is provided with an avoiding groove which avoids and penetrates through the middle rod, and the avoiding groove extends in the axial direction of the measuring mark. When the ground is settled, the measuring mark descends along with the ground settlement, after the settlement amount reaches a preset value, the measuring mark triggers the trigger switch on the monitoring ring, and the warning lamp starts to warn, and the pit edge foundation settlement monitoring device has the advantage of intelligently monitoring the settlement condition of the pit edge foundation.
本申请涉及建筑工程技术的领域,尤其是涉及一种坑边地基沉降监测装置,包括桩体、监测组件和测量标,监测组件还包括多个交替刚性连接的连接杆与监测环,桩体插设在高程基准点的位置上,连接杆和监测环沿垂直于桩体的方向延伸,且一端的连接杆刚性固定在桩体上,监测环上设置触发开关及警示灯,为防止周边环境的影响,在监测环内部设置中间杆,将触发开关设置在中间杆上,测量标开设有避让并穿设中间杆的避让槽,避让槽沿测量标轴向延伸,地面发生沉降时测量标随地面沉降而下降,沉降量达到预设值之后,测量标触发监测环上的触发开关,警示灯开始警示,本申请具有智能化监测坑边地基沉降的情况。
Pit edge foundation settlement monitoring device
The invention relates to the technical field of constructional engineering, in particular to a pit side foundation settlement monitoring device which comprises a pile body, a monitoring assembly and a measuring mark, the monitoring assembly further comprises a plurality of connecting rods and monitoring rings which are alternately and rigidly connected, the pile body is inserted in the position of an elevation datum point, and the connecting rods and the monitoring rings extend in the direction perpendicular to the pile body. In order to prevent the influence of the surrounding environment, a middle rod is arranged in the monitoring ring, the trigger switch is arranged on the middle rod, the measuring mark is provided with an avoiding groove which avoids and penetrates through the middle rod, and the avoiding groove extends in the axial direction of the measuring mark. When the ground is settled, the measuring mark descends along with the ground settlement, after the settlement amount reaches a preset value, the measuring mark triggers the trigger switch on the monitoring ring, and the warning lamp starts to warn, and the pit edge foundation settlement monitoring device has the advantage of intelligently monitoring the settlement condition of the pit edge foundation.
本申请涉及建筑工程技术的领域,尤其是涉及一种坑边地基沉降监测装置,包括桩体、监测组件和测量标,监测组件还包括多个交替刚性连接的连接杆与监测环,桩体插设在高程基准点的位置上,连接杆和监测环沿垂直于桩体的方向延伸,且一端的连接杆刚性固定在桩体上,监测环上设置触发开关及警示灯,为防止周边环境的影响,在监测环内部设置中间杆,将触发开关设置在中间杆上,测量标开设有避让并穿设中间杆的避让槽,避让槽沿测量标轴向延伸,地面发生沉降时测量标随地面沉降而下降,沉降量达到预设值之后,测量标触发监测环上的触发开关,警示灯开始警示,本申请具有智能化监测坑边地基沉降的情况。
Pit edge foundation settlement monitoring device
一种坑边地基沉降监测装置
LIU XINJIAN (Autor:in) / ZHANG LIANJUN (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Building foundation settlement deformation monitoring device
Europäisches Patentamt | 2023
|