Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Energy-saving construction process of building outer wall
The invention discloses an energy-saving construction process of a building outer wall, which comprises the following steps: S1, carrying out outer wall design by using a building information model (BIM) technology, and carrying out one-by-one determination according to the orientation, material selection and thickness of the building outer wall; s2, performing environment-friendly treatment on the material to increase the durability and heat insulation performance of the material; s3, a heat insulation layer is constructed, a multi-layer composite heat insulation system is adopted, and each layer of material has different heat insulation and ventilation characteristics so as to maximize the heat efficiency; and S4, an intelligent temperature control system is integrated in the outer wall, a temperature sensor is adopted, and the system can automatically adjust the ventilation and heat preservation performance of the wall according to indoor and outdoor temperature changes. The heat efficiency is maximized by adopting the multi-layer composite heat insulation system, the ventilation and heat preservation performance of the wall body can be automatically adjusted according to indoor and outdoor temperature changes by integrating the intelligent temperature control system in the outer wall, multiple factors are comprehensively considered in the calculation process of determining the optimal thickness of each material, and the construction accuracy is greatly improved.
本发明公开了一种建筑外墙的节能施工工艺,包括步骤:S1:使用建筑信息模型(BIM)技术进行外墙设计,根据建筑外墙的朝向、材料选择和厚度进行逐一确定;S2:对材料进行环保处理,增加其耐久性和隔热性能;S3:隔热层施工,采用多层复合隔热系统,每层材料具有不同的隔热和透气特性,以最大化热效率;S4:在外墙内集成智能温控系统,采用温度传感器,系统能根据室内外温度变化自动调节墙体的透气和保温性能。本申请采用多层复合隔热系统最大化热效率,在外墙内集成智能温控系统能根据室内外温度变化自动调节墙体的透气和保温性能,在确定每种材料的最佳厚度计算过程中,综合考虑多种因素,大大提升了施工准确度。
Energy-saving construction process of building outer wall
The invention discloses an energy-saving construction process of a building outer wall, which comprises the following steps: S1, carrying out outer wall design by using a building information model (BIM) technology, and carrying out one-by-one determination according to the orientation, material selection and thickness of the building outer wall; s2, performing environment-friendly treatment on the material to increase the durability and heat insulation performance of the material; s3, a heat insulation layer is constructed, a multi-layer composite heat insulation system is adopted, and each layer of material has different heat insulation and ventilation characteristics so as to maximize the heat efficiency; and S4, an intelligent temperature control system is integrated in the outer wall, a temperature sensor is adopted, and the system can automatically adjust the ventilation and heat preservation performance of the wall according to indoor and outdoor temperature changes. The heat efficiency is maximized by adopting the multi-layer composite heat insulation system, the ventilation and heat preservation performance of the wall body can be automatically adjusted according to indoor and outdoor temperature changes by integrating the intelligent temperature control system in the outer wall, multiple factors are comprehensively considered in the calculation process of determining the optimal thickness of each material, and the construction accuracy is greatly improved.
本发明公开了一种建筑外墙的节能施工工艺,包括步骤:S1:使用建筑信息模型(BIM)技术进行外墙设计,根据建筑外墙的朝向、材料选择和厚度进行逐一确定;S2:对材料进行环保处理,增加其耐久性和隔热性能;S3:隔热层施工,采用多层复合隔热系统,每层材料具有不同的隔热和透气特性,以最大化热效率;S4:在外墙内集成智能温控系统,采用温度传感器,系统能根据室内外温度变化自动调节墙体的透气和保温性能。本申请采用多层复合隔热系统最大化热效率,在外墙内集成智能温控系统能根据室内外温度变化自动调节墙体的透气和保温性能,在确定每种材料的最佳厚度计算过程中,综合考虑多种因素,大大提升了施工准确度。
Energy-saving construction process of building outer wall
一种建筑外墙的节能施工工艺
NI PENGFEI (Autor:in) / LI YUEHUA (Autor:in) / WANG LU (Autor:in) / BAI XUEDONG (Autor:in)
12.04.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated building outer wall energy-saving construction method
Europäisches Patentamt | 2024
|Energy-saving building outer wall structure and construction method
Europäisches Patentamt | 2024
|Energy-saving waterproof construction process for window frame of building outer wall
Europäisches Patentamt | 2022
|Green and energy-saving construction method for building outer wall
Europäisches Patentamt | 2020
|