Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tubular pile feeder for while-drilling pipe-following construction method and construction method
The pile feeder comprises a pile feeding cylinder, a plurality of connecting rods, an upper flange plate and a lower flange plate, the upper flange plate and the lower flange plate are welded to the upper end and the lower end of the pile feeding cylinder respectively, the connecting rods are evenly distributed on the outer side of the pile feeding cylinder, and the upper flange plate and the lower flange plate are welded to the upper end and the lower end of the pile feeding cylinder respectively. The connecting rod penetrates through the upper flange plate and the lower flange plate and is detachably connected with the upper flange plate and the lower flange plate, the pile feeding cylinder is of a hollow structure, and lifting lugs are arranged on the outer side of the pile feeding cylinder. The connecting rod is matched with the upper flange plate and the lower flange plate, detachable connection of the pile feeding cylinder and the pipe pile is achieved, compared with a traditional welding fixing mode, the adopted connecting rod and nut fixing mode enables disassembly between the pile feeding device and the pipe pile to be simpler and faster, the problem that disassembly is difficult after construction is completed is solved, the construction efficiency is improved, and the construction cost is reduced. And the working time is shortened. And the pile feeder can be prevented from deviating, and the construction effect and the safety of the drill rod are guaranteed.
本发明公开了一种用于随钻跟管施工法的管桩送桩器及施工方法,该送桩器包括送桩圆筒、多个连接杆、上法兰板和下法兰板,上法兰板和下法兰板分别焊接于送桩圆筒的上下两端部,多个连接杆均匀分布在送桩圆筒的外侧,连接杆穿过上法兰板和下法兰板,并分别与上法兰板及下法兰板可拆卸相连,送桩圆筒为中空结构,送桩圆筒的外侧设有吊耳。通过连接杆与上法兰板、下法兰板的配合,实现送桩圆筒与管桩的可拆卸连接,与传统的焊接固定方式相比,采用的连接杆和螺母固定方式使得送桩器与管桩之间的拆卸更简单快捷,解决了施工完成后拆卸困难的问题,提高了施工效率,缩短了工时。还能防止送桩器偏移,保证施工效果和钻杆的安全。
Tubular pile feeder for while-drilling pipe-following construction method and construction method
The pile feeder comprises a pile feeding cylinder, a plurality of connecting rods, an upper flange plate and a lower flange plate, the upper flange plate and the lower flange plate are welded to the upper end and the lower end of the pile feeding cylinder respectively, the connecting rods are evenly distributed on the outer side of the pile feeding cylinder, and the upper flange plate and the lower flange plate are welded to the upper end and the lower end of the pile feeding cylinder respectively. The connecting rod penetrates through the upper flange plate and the lower flange plate and is detachably connected with the upper flange plate and the lower flange plate, the pile feeding cylinder is of a hollow structure, and lifting lugs are arranged on the outer side of the pile feeding cylinder. The connecting rod is matched with the upper flange plate and the lower flange plate, detachable connection of the pile feeding cylinder and the pipe pile is achieved, compared with a traditional welding fixing mode, the adopted connecting rod and nut fixing mode enables disassembly between the pile feeding device and the pipe pile to be simpler and faster, the problem that disassembly is difficult after construction is completed is solved, the construction efficiency is improved, and the construction cost is reduced. And the working time is shortened. And the pile feeder can be prevented from deviating, and the construction effect and the safety of the drill rod are guaranteed.
本发明公开了一种用于随钻跟管施工法的管桩送桩器及施工方法,该送桩器包括送桩圆筒、多个连接杆、上法兰板和下法兰板,上法兰板和下法兰板分别焊接于送桩圆筒的上下两端部,多个连接杆均匀分布在送桩圆筒的外侧,连接杆穿过上法兰板和下法兰板,并分别与上法兰板及下法兰板可拆卸相连,送桩圆筒为中空结构,送桩圆筒的外侧设有吊耳。通过连接杆与上法兰板、下法兰板的配合,实现送桩圆筒与管桩的可拆卸连接,与传统的焊接固定方式相比,采用的连接杆和螺母固定方式使得送桩器与管桩之间的拆卸更简单快捷,解决了施工完成后拆卸困难的问题,提高了施工效率,缩短了工时。还能防止送桩器偏移,保证施工效果和钻杆的安全。
Tubular pile feeder for while-drilling pipe-following construction method and construction method
一种用于随钻跟管施工法的管桩送桩器及施工方法
LI CHENGLONG (Autor:in) / HU HAISHAN (Autor:in) / LUO HONGBIN (Autor:in) / LI XIESONG (Autor:in) / LU WEIMING (Autor:in) / ZHAO YUMING (Autor:in)
03.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|While-drilling pipe-following drainage anti-floating pile and construction method thereof
Europäisches Patentamt | 2023
|Large-diameter while-drilling pipe-following drainage pile device and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|While-drilling pipe pile construction device and method for calcareous sand stratum
Europäisches Patentamt | 2024
|