Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated anchor rod steel frame
The invention provides an assembly type anchor rod steel frame which comprises a plurality of first frame beams and second frame beams, and the first frame beams and the second frame beams intersect with each other. The anchor rod is arranged at the crossed position of the first frame beam and the second frame beam; the anchor head is located at the crossed position of the first frame beam and the second frame beam, and the anchor head is connected with the anchor rod; a frame beam made of concrete is replaced by the first frame beam and the second frame beam which are made of square steel pipes, the anchor rods are arranged at the crossed positions of the first frame beam and the second frame beam, and the anchor heads are adopted for sealing, so that construction is convenient, hoisting or manual carrying is adopted, the manual high-place operation time is shortened, and the construction efficiency is improved. The device is suitable for mountainous side slopes and other places where long-time manual high-place operation is needed and danger is high, the construction speed is high, factory prefabrication and on-site assembly can be achieved, maintenance is not needed, and the device is particularly suitable for rapid emergency rescue and disaster relief.
本发明提供了一种装配式锚杆钢框架,包含若干第一框架梁和第二框架梁,所述第一框架梁和第二框架梁互相交叉;锚杆,在所述第一框架梁和第二框架梁的交叉位置设置有锚杆;锚头,位于第一框架梁和第二框架梁的交叉位置,并且所述锚头与锚杆连接;本发明通过采用方钢管制成的第一框架梁和第二框架梁取代采用混凝土制成的框架梁,在第一框架梁和第二框架梁的交叉位置设置有锚杆,并采用锚头进行封闭,施工方便,采用吊装或人工搬运即可,减少人工高处作业时间,适用于山地边坡等,需要人工长时间高处作业,危险性高的地方,并且施工速度快,均可工厂预制,现场拼装,无需养护,特别适用于快速抢险救灾用。
Fabricated anchor rod steel frame
The invention provides an assembly type anchor rod steel frame which comprises a plurality of first frame beams and second frame beams, and the first frame beams and the second frame beams intersect with each other. The anchor rod is arranged at the crossed position of the first frame beam and the second frame beam; the anchor head is located at the crossed position of the first frame beam and the second frame beam, and the anchor head is connected with the anchor rod; a frame beam made of concrete is replaced by the first frame beam and the second frame beam which are made of square steel pipes, the anchor rods are arranged at the crossed positions of the first frame beam and the second frame beam, and the anchor heads are adopted for sealing, so that construction is convenient, hoisting or manual carrying is adopted, the manual high-place operation time is shortened, and the construction efficiency is improved. The device is suitable for mountainous side slopes and other places where long-time manual high-place operation is needed and danger is high, the construction speed is high, factory prefabrication and on-site assembly can be achieved, maintenance is not needed, and the device is particularly suitable for rapid emergency rescue and disaster relief.
本发明提供了一种装配式锚杆钢框架,包含若干第一框架梁和第二框架梁,所述第一框架梁和第二框架梁互相交叉;锚杆,在所述第一框架梁和第二框架梁的交叉位置设置有锚杆;锚头,位于第一框架梁和第二框架梁的交叉位置,并且所述锚头与锚杆连接;本发明通过采用方钢管制成的第一框架梁和第二框架梁取代采用混凝土制成的框架梁,在第一框架梁和第二框架梁的交叉位置设置有锚杆,并采用锚头进行封闭,施工方便,采用吊装或人工搬运即可,减少人工高处作业时间,适用于山地边坡等,需要人工长时间高处作业,危险性高的地方,并且施工速度快,均可工厂预制,现场拼装,无需养护,特别适用于快速抢险救灾用。
Fabricated anchor rod steel frame
一种装配式锚杆钢框架
KANG JIANWEI (Autor:in) / ZHANG JIAJIN (Autor:in) / SUN LINFENG (Autor:in) / CHENG TING (Autor:in) / LI QINGSONG (Autor:in) / LIN HAI (Autor:in)
14.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|