Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Power cable engineering installation construction protection mechanism
The power cable engineering installation construction protection mechanism comprises a preset pit, a force unloading connector is fixedly connected to the inner side end of the preset pit, a guardrail rod is fixedly connected to one end of the force unloading connector, a placement groove is formed in the side end of the guardrail rod, a guardrail plate is slidably connected to the inner end of the placement groove, and a framework storage groove is formed in the top end of the guardrail plate; the angle of the limiting plate can be accurately controlled through the rotating shaft, great convenience is provided for constructors, when a construction task is started, the constructors only need to simply rotate the limiting plate located at the bottom of the guardrail, original limitation of the limiting plate on the guardrail plate can be easily relieved, and once the limitation is relieved, the construction efficiency is greatly improved. The guardrail plate can smoothly slide out of the bottom of the guardrail rod through the placing groove, so that a convenient channel leading to the preset pit is opened for constructors, the constructors and construction equipment can easily enter the preset pit, the necessity of frequently moving the safety guardrail is greatly reduced, and the construction efficiency is improved.
本发明公开了一种电力电缆工程安装施工防护机构,包括:预设坑,预设坑内部侧端固定连接有卸力连接器,卸力连接器一端固定连接有护栏杆,护栏杆侧端开设有放置槽,放置槽内端滑动连接有护栏板,护栏板顶端开设有骨架收纳槽;本发明中通过转动轴,可以精确地控制限位板的角度,为施工人员提供极大的便利,当施工任务启动之际,施工人员只需简单地转动位于护栏底部的限位板,即可轻松解除其对护栏板的原有限制,一旦限制解除,护栏板便能顺畅地通过放置槽从护栏杆的底部滑出,从而为施工人员打开一条通往预设坑的便捷通道,这样一来,施工人员和施工设备便能轻松进入预设坑,大大减少了频繁移动安全护栏的必要性,从而提高施工效率。
Power cable engineering installation construction protection mechanism
The power cable engineering installation construction protection mechanism comprises a preset pit, a force unloading connector is fixedly connected to the inner side end of the preset pit, a guardrail rod is fixedly connected to one end of the force unloading connector, a placement groove is formed in the side end of the guardrail rod, a guardrail plate is slidably connected to the inner end of the placement groove, and a framework storage groove is formed in the top end of the guardrail plate; the angle of the limiting plate can be accurately controlled through the rotating shaft, great convenience is provided for constructors, when a construction task is started, the constructors only need to simply rotate the limiting plate located at the bottom of the guardrail, original limitation of the limiting plate on the guardrail plate can be easily relieved, and once the limitation is relieved, the construction efficiency is greatly improved. The guardrail plate can smoothly slide out of the bottom of the guardrail rod through the placing groove, so that a convenient channel leading to the preset pit is opened for constructors, the constructors and construction equipment can easily enter the preset pit, the necessity of frequently moving the safety guardrail is greatly reduced, and the construction efficiency is improved.
本发明公开了一种电力电缆工程安装施工防护机构,包括:预设坑,预设坑内部侧端固定连接有卸力连接器,卸力连接器一端固定连接有护栏杆,护栏杆侧端开设有放置槽,放置槽内端滑动连接有护栏板,护栏板顶端开设有骨架收纳槽;本发明中通过转动轴,可以精确地控制限位板的角度,为施工人员提供极大的便利,当施工任务启动之际,施工人员只需简单地转动位于护栏底部的限位板,即可轻松解除其对护栏板的原有限制,一旦限制解除,护栏板便能顺畅地通过放置槽从护栏杆的底部滑出,从而为施工人员打开一条通往预设坑的便捷通道,这样一来,施工人员和施工设备便能轻松进入预设坑,大大减少了频繁移动安全护栏的必要性,从而提高施工效率。
Power cable engineering installation construction protection mechanism
一种电力电缆工程安装施工防护机构
GAO ZHAOLIANG (Autor:in)
14.05.2024
Patent
Elektronische Ressource
Chinesisch
Railway bridge pier protection mechanism and construction and installation method
Europäisches Patentamt | 2024
|Installation construction method of photovoltaic inhaul cable
Europäisches Patentamt | 2024
|Anchor cable construction auxiliary equipment and anchor cable installation method
Europäisches Patentamt | 2021
|Cable trench embedded part installation construction method
Europäisches Patentamt | 2023
|