Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
One-pile dual-purpose construction method for end-bearing cast-in-place pile
The invention discloses a dual-purpose construction method for an end-bearing cast-in-place pile, and relates to the technical field of building construction.The construction method comprises the steps that 1, land survey is conducted, specifically, an underground soil layer at a construction area is surveyed; 2, construction position calibration is conducted, specifically, the construction positions of the foundation pit and all foundation piles in the pile foundation are calibrated, and part of the foundation piles are delimited to serve as slope protection piles of the side wall of the foundation pit; 3, foundation pile construction is conducted, specifically, foundation pile construction is completed at all construction positions; 4, the foundation pit is excavated, and after excavation of the foundation pit is completed, foundation piles which are delimited in advance and used as slope protection piles of the foundation pit are located at the slope positions of the foundation pit; 5, foundation pit backfilling is conducted, and earthwork backfilling is conducted on the foundation pit; and 6, the integrity of the foundation piles is detected, specifically, the integrity of all the foundation piles used as the foundation pit slope protection piles is detected through third-party detection equipment. The foundation pile of the pile foundation is directly used as the slope protection pile of the side wall of the foundation pit, the construction period is effectively shortened, and the construction cost is reduced.
本申请公开了一种端承型灌注桩一桩两用的施工方法,涉及建筑施工的技术领域,其步骤1、土地勘测,对施工区域处的地下土层进行勘测;步骤2、施工位置标定,标定基坑以及桩基础中各基桩的施工位置,并划定部分基桩作为基坑侧壁的护坡桩;步骤3、基桩施工,在各施工位置处分别完成基桩的施工;步骤4、基坑开挖,基坑开挖完成后,预先划定的用作基坑护坡桩的基桩位于基坑的边坡位置;步骤5、基坑回填,对基坑进行土方回填;步骤6、基桩完整性检测,通过第三方检测设备对用作基坑护坡桩的各基桩完整性进行检测。本申请通过将桩基础的基桩直接用作基坑侧壁的护坡桩,有效缩短了施工周期,并降低施工成本。
One-pile dual-purpose construction method for end-bearing cast-in-place pile
The invention discloses a dual-purpose construction method for an end-bearing cast-in-place pile, and relates to the technical field of building construction.The construction method comprises the steps that 1, land survey is conducted, specifically, an underground soil layer at a construction area is surveyed; 2, construction position calibration is conducted, specifically, the construction positions of the foundation pit and all foundation piles in the pile foundation are calibrated, and part of the foundation piles are delimited to serve as slope protection piles of the side wall of the foundation pit; 3, foundation pile construction is conducted, specifically, foundation pile construction is completed at all construction positions; 4, the foundation pit is excavated, and after excavation of the foundation pit is completed, foundation piles which are delimited in advance and used as slope protection piles of the foundation pit are located at the slope positions of the foundation pit; 5, foundation pit backfilling is conducted, and earthwork backfilling is conducted on the foundation pit; and 6, the integrity of the foundation piles is detected, specifically, the integrity of all the foundation piles used as the foundation pit slope protection piles is detected through third-party detection equipment. The foundation pile of the pile foundation is directly used as the slope protection pile of the side wall of the foundation pit, the construction period is effectively shortened, and the construction cost is reduced.
本申请公开了一种端承型灌注桩一桩两用的施工方法,涉及建筑施工的技术领域,其步骤1、土地勘测,对施工区域处的地下土层进行勘测;步骤2、施工位置标定,标定基坑以及桩基础中各基桩的施工位置,并划定部分基桩作为基坑侧壁的护坡桩;步骤3、基桩施工,在各施工位置处分别完成基桩的施工;步骤4、基坑开挖,基坑开挖完成后,预先划定的用作基坑护坡桩的基桩位于基坑的边坡位置;步骤5、基坑回填,对基坑进行土方回填;步骤6、基桩完整性检测,通过第三方检测设备对用作基坑护坡桩的各基桩完整性进行检测。本申请通过将桩基础的基桩直接用作基坑侧壁的护坡桩,有效缩短了施工周期,并降低施工成本。
One-pile dual-purpose construction method for end-bearing cast-in-place pile
一种端承型灌注桩一桩两用的施工方法
YANG JIBIN (Autor:in) / HUANG DIANNENG (Autor:in) / HU WENWEN (Autor:in) / YIN SHENGFU (Autor:in) / JIANG HAIPING (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
One-pile dual-purpose construction method for end-bearing cast-in-place pile
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|CAST-IN-PLACE PILE AND CONSTRUCTION METHOD OF CAST-IN-PLACE PILE
Europäisches Patentamt | 2023
|Cast-in-place pile construction auxiliary device and cast-in-place pile construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|