Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork erecting device for pile foundation construction and using method thereof
The invention discloses a formwork erecting device for pile foundation construction and a using method, the formwork erecting device for pile foundation construction comprises a connecting plate, adsorption mechanisms are evenly embedded in an inner cavity of the connecting plate, one end of a supporting column is fixedly installed on the side wall of a connecting block, and the other end of the supporting column is slidably connected to the outer side wall of a supporting rod. A movable plate is driven by a supporting rod to adjust the distance between the movable plate and a reinforcing steel bar, then a second connecting frame is rotated with two threaded columns on the surface of a movable base as the center, the angle of the movable plate is locked through fastening of nuts and the threaded columns, and a plurality of first clamping plates move along with a movable base along with rotation of a lead screw; the first clamping plates and the second clamping plates are clamped to the two sides of the steel bars, multi-point fixing is carried out through the multiple sets of first clamping plates and second clamping plates, the stability of the connecting plate is guaranteed, the stability of a pouring mold is guaranteed, and then the pile foundation construction quality is guaranteed.
本发明公开了一种桩基施工用支模装置及使用方法,包括连接板,连接板的内腔均匀的嵌入安装有吸附机构,连接块的侧壁固定安装有支撑柱的一端,支撑柱的另一端滑动连接在支撑杆的外侧壁,在施工的时候,通过支撑杆带动活动板调节与钢筋之间的距离,然后以活动座表面的两个螺纹柱为中心转动第二连接架,使通过螺母与螺纹柱的紧固将活动板角度锁定,随着丝杠的转动使得多个第一卡接板随着移动座移动,从而将第一卡接板和第二卡接板分别卡接在各处钢筋的两侧,通过多组第一卡接板和第二卡接板进行多点固定,保证了连接板的稳定性,从而保证了浇筑模具的稳定性,进而保证了桩基施工的质量。
Formwork erecting device for pile foundation construction and using method thereof
The invention discloses a formwork erecting device for pile foundation construction and a using method, the formwork erecting device for pile foundation construction comprises a connecting plate, adsorption mechanisms are evenly embedded in an inner cavity of the connecting plate, one end of a supporting column is fixedly installed on the side wall of a connecting block, and the other end of the supporting column is slidably connected to the outer side wall of a supporting rod. A movable plate is driven by a supporting rod to adjust the distance between the movable plate and a reinforcing steel bar, then a second connecting frame is rotated with two threaded columns on the surface of a movable base as the center, the angle of the movable plate is locked through fastening of nuts and the threaded columns, and a plurality of first clamping plates move along with a movable base along with rotation of a lead screw; the first clamping plates and the second clamping plates are clamped to the two sides of the steel bars, multi-point fixing is carried out through the multiple sets of first clamping plates and second clamping plates, the stability of the connecting plate is guaranteed, the stability of a pouring mold is guaranteed, and then the pile foundation construction quality is guaranteed.
本发明公开了一种桩基施工用支模装置及使用方法,包括连接板,连接板的内腔均匀的嵌入安装有吸附机构,连接块的侧壁固定安装有支撑柱的一端,支撑柱的另一端滑动连接在支撑杆的外侧壁,在施工的时候,通过支撑杆带动活动板调节与钢筋之间的距离,然后以活动座表面的两个螺纹柱为中心转动第二连接架,使通过螺母与螺纹柱的紧固将活动板角度锁定,随着丝杠的转动使得多个第一卡接板随着移动座移动,从而将第一卡接板和第二卡接板分别卡接在各处钢筋的两侧,通过多组第一卡接板和第二卡接板进行多点固定,保证了连接板的稳定性,从而保证了浇筑模具的稳定性,进而保证了桩基施工的质量。
Formwork erecting device for pile foundation construction and using method thereof
一种桩基施工用支模装置及其使用方法
FENG HAO (Autor:in) / ZHU GENSHEN (Autor:in) / ZHANG WEI (Autor:in) / HU CHUNQIANG (Autor:in) / ZHANG MINGMING (Autor:in) / WANG XINLEI (Autor:in) / ZHAN HEHE (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Formwork erecting and maintaining integrated formwork and construction method thereof
Europäisches Patentamt | 2024
|Formwork erecting structure and construction method thereof
Europäisches Patentamt | 2023
|Simple formwork erecting structure in transmission line foundation construction
Europäisches Patentamt | 2016
|