Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wall concrete casting molding template system
The invention discloses a wall concrete casting molding formwork system which comprises a wall left side face formwork, a wall right side face formwork and a wall right side face formwork. A wall body right side surface template; a wall body front end face template; a first template pulling mechanism; the second formwork tying mechanism comprises a plurality of second pull rods which are arranged between the wall body left side face formwork and the wall body front end face formwork and between the wall body right side face formwork and the wall body front end face formwork in the horizontal transverse direction; the two ends of each second pull rod are provided with a front-end pulling piece and a rear-end pulling piece through locking pieces respectively, the front-end pulling pieces are connected with the corresponding portions of the outer sides of the corresponding wall body front-end formwork positioning components in a matched mode, and the rear-end pulling pieces are connected with the corresponding left-side pulling pieces or the corresponding right-side pulling pieces in a matched mode. And at least two front-end tie pieces are arranged on each wall front-end template positioning component at intervals in the horizontal longitudinal direction, and are distributed on the outer side of the wall left-side template and the outer side of the wall right-side template.
本发明公开了一种墙体混凝土浇注成型模板系统,包括:墙体左侧面模板;墙体右侧面模板;墙体前端面模板;第一模板拉结机构;第二模板拉结机构,所述第二模板拉结机构包含沿水平横向方向设置在墙体左侧面模板与墙体前端面模板之间以及墙体右侧面模板与墙体前端面模板之间的多个第二拉杆,各第二拉杆的两端分别通过锁紧件安装有前端拉结件和后端拉结件,所述前端拉结件与对应墙体前端模板定位构件的外侧对应部位适配连接,所述后端拉结件与对应左侧拉结件或右侧拉结件适配连接,各墙体前端模板定位构件上沿水平纵向方向间隔排列设置有至少两个前端拉结件,所述至少两个前端拉结件分布在墙体左侧面模板的外侧与墙体右侧面模板外侧。
Wall concrete casting molding template system
The invention discloses a wall concrete casting molding formwork system which comprises a wall left side face formwork, a wall right side face formwork and a wall right side face formwork. A wall body right side surface template; a wall body front end face template; a first template pulling mechanism; the second formwork tying mechanism comprises a plurality of second pull rods which are arranged between the wall body left side face formwork and the wall body front end face formwork and between the wall body right side face formwork and the wall body front end face formwork in the horizontal transverse direction; the two ends of each second pull rod are provided with a front-end pulling piece and a rear-end pulling piece through locking pieces respectively, the front-end pulling pieces are connected with the corresponding portions of the outer sides of the corresponding wall body front-end formwork positioning components in a matched mode, and the rear-end pulling pieces are connected with the corresponding left-side pulling pieces or the corresponding right-side pulling pieces in a matched mode. And at least two front-end tie pieces are arranged on each wall front-end template positioning component at intervals in the horizontal longitudinal direction, and are distributed on the outer side of the wall left-side template and the outer side of the wall right-side template.
本发明公开了一种墙体混凝土浇注成型模板系统,包括:墙体左侧面模板;墙体右侧面模板;墙体前端面模板;第一模板拉结机构;第二模板拉结机构,所述第二模板拉结机构包含沿水平横向方向设置在墙体左侧面模板与墙体前端面模板之间以及墙体右侧面模板与墙体前端面模板之间的多个第二拉杆,各第二拉杆的两端分别通过锁紧件安装有前端拉结件和后端拉结件,所述前端拉结件与对应墙体前端模板定位构件的外侧对应部位适配连接,所述后端拉结件与对应左侧拉结件或右侧拉结件适配连接,各墙体前端模板定位构件上沿水平纵向方向间隔排列设置有至少两个前端拉结件,所述至少两个前端拉结件分布在墙体左侧面模板的外侧与墙体右侧面模板外侧。
Wall concrete casting molding template system
墙体混凝土浇注成型模板系统
TIAN ZEHUI (Autor:in) / WU SISHAN (Autor:in) / ZHANG ZHENGYU (Autor:in) / HE HENGYI (Autor:in) / LIU GANG (Autor:in) / ZHAO XIAOLONG (Autor:in) / WANG XINGREN (Autor:in)
28.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Supporting system for casting concrete floor slab and beam bottom template
Europäisches Patentamt | 2015
|Shear wall hole lower concrete casting device and shear wall hole lower concrete casting method
Europäisches Patentamt | 2015
|Faced concrete outer wall template construction method
Europäisches Patentamt | 2020
|