Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rectangular cast-in-place pile construction equipment and pile forming method thereof
The invention provides rectangular cast-in-place pile construction equipment and a pile forming method thereof. The rectangular cast-in-place pile construction equipment comprises a walking track, a main support, a plane displacement mechanism, an excavation system, a rectangular frame drill bit and a retaining wall feeding mechanism. The main support is connected to the walking track and can move front, back, left and right through the walking track. The plane displacement mechanism is arranged on the main support. The excavation system comprises a tunneling mechanism and a telescopic mechanism, one end of the telescopic mechanism is connected with the plane displacement mechanism, and the other end of the telescopic mechanism is connected with the tunneling mechanism. A rectangular protection wall assembly is arranged between the frame drill bit and the plane displacement mechanism, a cavity is defined by the rectangular frame drill bit, convex teeth are arranged on the periphery of the end opening, away from the main support, of the rectangular frame drill bit, and the tunneling mechanism is located in the cavity and fixed to the rectangular frame drill bit during tunneling work. According to the construction equipment and method for the rectangular cast-in-place pile, high-precision and intelligent mechanical hole forming and supporting are achieved, the equipment and method can adapt to various stratums, the pile forming problem of the rectangular pile is solved, and the pile forming quality and efficiency are improved.
本申请提供一种矩形灌注桩施工装备及其成桩方法,装备包括:步履、主支架、平面移位机构、开挖系统、矩形框架钻头和护壁进给机构。主支架连接于步履,主支架能通过所述步履前后左右移动。平面移位机构设置于主支架。开挖系统包括掘进机构和伸缩机构,伸缩机构一端连接平面移位机构,伸缩机构的另一端连接掘进机构。框架钻头和平面移位机构之间用于设置矩形护壁组件,矩形框架钻头围合形成腔体,矩形框架钻头背离主支架的端口一周设置凸齿,掘进机构位于腔体内且掘进机构在掘进工作时固定至矩形框架钻头。本申请的矩形灌注桩施工装备及方法实现了高精度、智能化机械成孔和支护,可适应各种地层,解决了矩形桩成桩的难题,提高了成桩质量和效率。
Rectangular cast-in-place pile construction equipment and pile forming method thereof
The invention provides rectangular cast-in-place pile construction equipment and a pile forming method thereof. The rectangular cast-in-place pile construction equipment comprises a walking track, a main support, a plane displacement mechanism, an excavation system, a rectangular frame drill bit and a retaining wall feeding mechanism. The main support is connected to the walking track and can move front, back, left and right through the walking track. The plane displacement mechanism is arranged on the main support. The excavation system comprises a tunneling mechanism and a telescopic mechanism, one end of the telescopic mechanism is connected with the plane displacement mechanism, and the other end of the telescopic mechanism is connected with the tunneling mechanism. A rectangular protection wall assembly is arranged between the frame drill bit and the plane displacement mechanism, a cavity is defined by the rectangular frame drill bit, convex teeth are arranged on the periphery of the end opening, away from the main support, of the rectangular frame drill bit, and the tunneling mechanism is located in the cavity and fixed to the rectangular frame drill bit during tunneling work. According to the construction equipment and method for the rectangular cast-in-place pile, high-precision and intelligent mechanical hole forming and supporting are achieved, the equipment and method can adapt to various stratums, the pile forming problem of the rectangular pile is solved, and the pile forming quality and efficiency are improved.
本申请提供一种矩形灌注桩施工装备及其成桩方法,装备包括:步履、主支架、平面移位机构、开挖系统、矩形框架钻头和护壁进给机构。主支架连接于步履,主支架能通过所述步履前后左右移动。平面移位机构设置于主支架。开挖系统包括掘进机构和伸缩机构,伸缩机构一端连接平面移位机构,伸缩机构的另一端连接掘进机构。框架钻头和平面移位机构之间用于设置矩形护壁组件,矩形框架钻头围合形成腔体,矩形框架钻头背离主支架的端口一周设置凸齿,掘进机构位于腔体内且掘进机构在掘进工作时固定至矩形框架钻头。本申请的矩形灌注桩施工装备及方法实现了高精度、智能化机械成孔和支护,可适应各种地层,解决了矩形桩成桩的难题,提高了成桩质量和效率。
Rectangular cast-in-place pile construction equipment and pile forming method thereof
一种矩形灌注桩施工装备及其成桩方法
SHI HONGBIN (Autor:in) / MAO ZHONGLIANG (Autor:in) / LIU BAILIN (Autor:in) / WANG XUMING (Autor:in) / LIU CHUNXIAO (Autor:in) / LENG CHANGMING (Autor:in) / CHEN XIAOLI (Autor:in) / GUO JING (Autor:in) / YANG ZHENWEI (Autor:in) / HU JIAWEI (Autor:in)
04.06.2024
Patent
Elektronische Ressource
Chinesisch
Pile head forming equipment of cast-in-place concrete pile
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Rectangular pile hole repairing equipment and rectangular pile hole forming construction method
Europäisches Patentamt | 2024
|Cast-in-place pile-prestressed pipe pile composite pile and construction method thereof
Europäisches Patentamt | 2021
|