Foundation bolt tool of steel structure stand column
The foundation bolt tool of the steel structure stand column comprises a positioning ring plate, a plurality of sets of embedded rods are arranged on the positioning ring plate, the other end of each embedded rod penetrates through a connecting plate and is locked, and the connecting plate and the plate face of the positioning ring plate are in the same direction; the embedded rod comprises a screw rod, a positioning bolt and a sleeve, the sleeve is located between the positioning ring plate and the connecting plate, the screw rod penetrates through the connecting plate and then is in threaded connection with the sleeve, and the positioning bolt penetrates through the positioning ring plate and then is in threaded connection with the sleeve. The lower portion of the tool and a reinforcement cage (or a reinforcement mesh) in a foundation are fixed through the connecting plate, the situation that the embedded rod is disturbed by foundation pouring concrete and inclines is prevented, reworking is avoided, the construction cost is reduced, and the construction period is guaranteed; and through the detachable and adjustable embedded rod, the construction convenience and adjustability of the tool are improved, so that the tool can be used in various construction standards during quantitative and batch prefabrication.
本发明提供一种钢结构立柱的地脚螺栓工装,其包括定位环板,所述定位环板上设有若干组预埋杆,各所述预埋杆的另一端贯穿连接板并锁紧,所述连接板与所述定位环板的板面同向;所述预埋杆包括螺杆、定位螺栓和套筒,所述套筒位于所述定位环板和所述连接板之间,所述螺杆贯穿所述连接板后螺接所述套筒,所述定位螺栓贯穿所述定位环板后螺接所述套筒。本发明通过连接板将本工装的下部与基础中钢筋笼(或钢筋网)固定,防止预埋杆受基础浇筑混凝土的扰动而歪斜,避免返工,降低施工成本,保证工期;通过可拆卸、可调节的预埋杆,提高本工装的施工便利度和可调节性,以达到定量化、批量化预制时,可在多种施工标准中使用。
Foundation bolt tool of steel structure stand column
The foundation bolt tool of the steel structure stand column comprises a positioning ring plate, a plurality of sets of embedded rods are arranged on the positioning ring plate, the other end of each embedded rod penetrates through a connecting plate and is locked, and the connecting plate and the plate face of the positioning ring plate are in the same direction; the embedded rod comprises a screw rod, a positioning bolt and a sleeve, the sleeve is located between the positioning ring plate and the connecting plate, the screw rod penetrates through the connecting plate and then is in threaded connection with the sleeve, and the positioning bolt penetrates through the positioning ring plate and then is in threaded connection with the sleeve. The lower portion of the tool and a reinforcement cage (or a reinforcement mesh) in a foundation are fixed through the connecting plate, the situation that the embedded rod is disturbed by foundation pouring concrete and inclines is prevented, reworking is avoided, the construction cost is reduced, and the construction period is guaranteed; and through the detachable and adjustable embedded rod, the construction convenience and adjustability of the tool are improved, so that the tool can be used in various construction standards during quantitative and batch prefabrication.
本发明提供一种钢结构立柱的地脚螺栓工装,其包括定位环板,所述定位环板上设有若干组预埋杆,各所述预埋杆的另一端贯穿连接板并锁紧,所述连接板与所述定位环板的板面同向;所述预埋杆包括螺杆、定位螺栓和套筒,所述套筒位于所述定位环板和所述连接板之间,所述螺杆贯穿所述连接板后螺接所述套筒,所述定位螺栓贯穿所述定位环板后螺接所述套筒。本发明通过连接板将本工装的下部与基础中钢筋笼(或钢筋网)固定,防止预埋杆受基础浇筑混凝土的扰动而歪斜,避免返工,降低施工成本,保证工期;通过可拆卸、可调节的预埋杆,提高本工装的施工便利度和可调节性,以达到定量化、批量化预制时,可在多种施工标准中使用。
Foundation bolt tool of steel structure stand column
一种钢结构立柱的地脚螺栓工装
CHEN PEILIN (Autor:in) / ZHENG LEI (Autor:in) / KIM WOO-DONG (Autor:in)
04.06.2024
Patent
Elektronische Ressource
Chinesisch
Positioning method for embedded foundation bolt of steel structure stand column
Europäisches Patentamt | 2023
|Steel-reinforced column foundation bolt embedding structure
Europäisches Patentamt | 2021
|Foundation anchor bolt reinforcing structure for raw bamboo stand column
Europäisches Patentamt | 2022
|Steel structure column foundation bolt pre-embedding construction method
Europäisches Patentamt | 2023
|