Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Embedded sleeve and construction method thereof
The invention relates to the technical field of pre-buried casing pipe construction, in particular to a pre-buried casing pipe and a construction method thereof.The pre-buried casing pipe comprises an outer casing pipe, and an inner casing pipe is arranged in the outer casing pipe; adjusting holes are formed in the upper side, the lower side, the left side and the right side of the outer sleeve. An adjusting bolt and an adjusting nut are further included, and the adjusting bolt penetrates through the adjusting hole to abut against the outer wall of the inner sleeve; the adjusting bolts are fixed to the outer sleeve through the adjusting nuts, and the position of the inner sleeve is fixed through the combined action of the four adjusting bolts. By adjusting the adjusting bolt in the later period, the position of the inner sleeve in the outer sleeve can be adjusted, it is guaranteed that the axes of all pipelines from top to bottom are located on the same axis during pipeline installation, position deviation after the sleeves are embedded can be avoided, and the situation that structural quality, labor waste and the construction period are affected by later chiseling is avoided; one-time pipeline installation is guaranteed, construction is simple, labor is saved, and the construction period is shortened.
本发明涉及预埋套管施工技术领域,具体的说是一种预埋套管及其施工方法,包括外套管,外套管中设置有内套管;外套管上、下、左、右四侧均开设有调节孔;还包括调节螺栓和调节螺母,调节螺栓穿过调节孔抵接在内套管外壁上;调节螺栓通过调节螺母与外套管固定,内套管通过四个调节螺栓共同作用进行位置固定;本发明通过后期调节调节螺栓,能够调节内套管在外套管中的位置,保证进行管道安装时,由上至下所有管道的轴心处于同一轴线上,能够避免预埋套管后发现位置出现偏差,避免后期剔凿影响结构质量、人工浪费和工期,保证管道安装一次成活,施工简单,节约了人工,缩短了工期’。
Embedded sleeve and construction method thereof
The invention relates to the technical field of pre-buried casing pipe construction, in particular to a pre-buried casing pipe and a construction method thereof.The pre-buried casing pipe comprises an outer casing pipe, and an inner casing pipe is arranged in the outer casing pipe; adjusting holes are formed in the upper side, the lower side, the left side and the right side of the outer sleeve. An adjusting bolt and an adjusting nut are further included, and the adjusting bolt penetrates through the adjusting hole to abut against the outer wall of the inner sleeve; the adjusting bolts are fixed to the outer sleeve through the adjusting nuts, and the position of the inner sleeve is fixed through the combined action of the four adjusting bolts. By adjusting the adjusting bolt in the later period, the position of the inner sleeve in the outer sleeve can be adjusted, it is guaranteed that the axes of all pipelines from top to bottom are located on the same axis during pipeline installation, position deviation after the sleeves are embedded can be avoided, and the situation that structural quality, labor waste and the construction period are affected by later chiseling is avoided; one-time pipeline installation is guaranteed, construction is simple, labor is saved, and the construction period is shortened.
本发明涉及预埋套管施工技术领域,具体的说是一种预埋套管及其施工方法,包括外套管,外套管中设置有内套管;外套管上、下、左、右四侧均开设有调节孔;还包括调节螺栓和调节螺母,调节螺栓穿过调节孔抵接在内套管外壁上;调节螺栓通过调节螺母与外套管固定,内套管通过四个调节螺栓共同作用进行位置固定;本发明通过后期调节调节螺栓,能够调节内套管在外套管中的位置,保证进行管道安装时,由上至下所有管道的轴心处于同一轴线上,能够避免预埋套管后发现位置出现偏差,避免后期剔凿影响结构质量、人工浪费和工期,保证管道安装一次成活,施工简单,节约了人工,缩短了工期’。
Embedded sleeve and construction method thereof
预埋套管及其施工方法
CAO SHIFEI (Autor:in) / AHN KYUNG-MIN (Autor:in) / LI BO (Autor:in)
04.06.2024
Patent
Elektronische Ressource
Chinesisch
Electrical embedded sleeve and construction method thereof
Europäisches Patentamt | 2023
|Novel plastic embedded sleeve and construction method thereof
Europäisches Patentamt | 2023
|Detachable wall pre-embedded sleeve and construction method thereof
Europäisches Patentamt | 2020
|Matrix frame type group pre-embedded sleeve and construction method thereof
Europäisches Patentamt | 2024
|