Truss tower switching section pre-assembly method
The invention discloses a truss tower switching section pre-assembly method which comprises the following steps: step 1, a vertical ladder and an internal platform in a switching section main body are firmly mounted to serve as an internal climbing channel and an operation platform of a switching section cylinder; 2, the site is cleaned, steel plates are laid in the site, and the steel plates are welded into a whole; in order to control the on-site hoisting size, the switching section is pre-assembled, pre-assembly in a vertical state is carried out in a factory in advance, a base reserved welded junction is welded according to the actual assembly size after assembly, and a switching section body is rotated to a proper position in a horizontal state; the connecting elbow of the upper half portion of the first supporting beam needs to be connected with the upper adapter flange of the adapter section body in advance, then the center cylinder jig frame and the base jig frame are installed according to the size, pretreatment is conducted on position positioning of the adapter section body and the three sets of supporting beams, and the welding difficulty between the adapter section body and the supporting beams in the follow-up process is greatly reduced.
本发明公开了一种桁架塔转接段预拼装方法,该拼装方法包括以下步骤,步骤1:将转接段主体内部直爬梯及内部平台安装牢固,作为转接段筒体内部攀爬通道及操作平台;步骤2:清理场地,并在场地中铺设钢板,钢板之间焊接成一整体。本发明为控制现场吊装尺寸进行转接段预拼装,提前在厂内进行直立状态下的预拼装,底座预留焊口在拼装后根据实际装配尺寸进行焊接,在将转接段主体在水平状态下转至合适的位置,需提前将支撑梁一的上半部分连接弯头与转接段主体的上转接法兰连接,然后通过尺寸安装中心筒胎架与底座胎架,为转接段主体以及三组支撑梁的位置定位进行预处理,大大降低了后续转接段主体与支撑梁之间的焊接的难度。
Truss tower switching section pre-assembly method
The invention discloses a truss tower switching section pre-assembly method which comprises the following steps: step 1, a vertical ladder and an internal platform in a switching section main body are firmly mounted to serve as an internal climbing channel and an operation platform of a switching section cylinder; 2, the site is cleaned, steel plates are laid in the site, and the steel plates are welded into a whole; in order to control the on-site hoisting size, the switching section is pre-assembled, pre-assembly in a vertical state is carried out in a factory in advance, a base reserved welded junction is welded according to the actual assembly size after assembly, and a switching section body is rotated to a proper position in a horizontal state; the connecting elbow of the upper half portion of the first supporting beam needs to be connected with the upper adapter flange of the adapter section body in advance, then the center cylinder jig frame and the base jig frame are installed according to the size, pretreatment is conducted on position positioning of the adapter section body and the three sets of supporting beams, and the welding difficulty between the adapter section body and the supporting beams in the follow-up process is greatly reduced.
本发明公开了一种桁架塔转接段预拼装方法,该拼装方法包括以下步骤,步骤1:将转接段主体内部直爬梯及内部平台安装牢固,作为转接段筒体内部攀爬通道及操作平台;步骤2:清理场地,并在场地中铺设钢板,钢板之间焊接成一整体。本发明为控制现场吊装尺寸进行转接段预拼装,提前在厂内进行直立状态下的预拼装,底座预留焊口在拼装后根据实际装配尺寸进行焊接,在将转接段主体在水平状态下转至合适的位置,需提前将支撑梁一的上半部分连接弯头与转接段主体的上转接法兰连接,然后通过尺寸安装中心筒胎架与底座胎架,为转接段主体以及三组支撑梁的位置定位进行预处理,大大降低了后续转接段主体与支撑梁之间的焊接的难度。
Truss tower switching section pre-assembly method
一种桁架塔转接段预拼装方法
JI YIFEI (Autor:in) / XIE XIAOYUN (Autor:in) / DUAN YONGJUN (Autor:in) / KONG LINGWEI (Autor:in) / LIU HAOBING (Autor:in) / LIN XIAOXUAN (Autor:in) / CHEN XIAORONG (Autor:in) / YAN HAIBO (Autor:in) / WANG FANGLI (Autor:in) / YANG HONG (Autor:in)
07.06.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Construction method of cable bent tower assembly type truss steel mould system
Europäisches Patentamt | 2023
|