Construction method for positioning and mounting pre-embedded anchoring parts of large aircraft high-speed test sliding rail
The invention discloses a construction method for positioning and installing a large aircraft high-speed test sliding rail embedded anchoring part. The construction method comprises the following steps: S1, positioning and installing an embedded sleeve: measuring and setting out an installation position, planting steel bars for fixing, and grouting and pouring; s2, measuring and setting out; s3, brushing an interface agent; s4, assembling a combined part: combining and assembling the screw rod, the pre-embedded plate and a matched component, and placing in the pre-embedded sleeve; s5, the tool is in place, specifically, the tool is used for suspending the screw, and a measuring instrument is used for accurately adjusting the axis and the elevation of the tool; s6, assembly fine adjustment and positioning, specifically, the screws are finely adjusted one by one, and the perpendicularity of the screws and the flatness of the embedded plate are comprehensively rechecked; s7, fixing the pre-embedded plates, wherein the pre-embedded plates are welded and fixed through steel bars; and S8, secondary grouting is conducted, specifically, grouting is conducted within the grouting range. The anchor rod has the advantages of accurate positioning, firm anchoring and convenience in maintenance and replacement during later operation.
本发明公开了一种大飞机高速试验滑轨预埋锚固件定位安装的施工方法,包括以下步骤:S1:预埋套管定位安装:测量放样出安装位置,植筋固定,灌浆浇筑;S2:测量放样;S3:刷界面剂;S4:组合件拼装:将螺杆和预埋板及配套组件进行组合拼装,并安放至预埋套管内;S5:工装就位:使用工装对螺杆进行悬吊,采用测量仪器对工装的轴线、高程进行精确调整;S6:组合件精调定位:采对螺杆进行逐个精调,对螺杆的垂直度及预埋板的平整度进行全面复核;S7:预埋板固定:采用钢筋对预埋板进行焊接固定;S8:二次灌浆:在灌浆范围内注浆。具有定位精准、锚固牢固、后期运营时方便维修更换的优点。
Construction method for positioning and mounting pre-embedded anchoring parts of large aircraft high-speed test sliding rail
The invention discloses a construction method for positioning and installing a large aircraft high-speed test sliding rail embedded anchoring part. The construction method comprises the following steps: S1, positioning and installing an embedded sleeve: measuring and setting out an installation position, planting steel bars for fixing, and grouting and pouring; s2, measuring and setting out; s3, brushing an interface agent; s4, assembling a combined part: combining and assembling the screw rod, the pre-embedded plate and a matched component, and placing in the pre-embedded sleeve; s5, the tool is in place, specifically, the tool is used for suspending the screw, and a measuring instrument is used for accurately adjusting the axis and the elevation of the tool; s6, assembly fine adjustment and positioning, specifically, the screws are finely adjusted one by one, and the perpendicularity of the screws and the flatness of the embedded plate are comprehensively rechecked; s7, fixing the pre-embedded plates, wherein the pre-embedded plates are welded and fixed through steel bars; and S8, secondary grouting is conducted, specifically, grouting is conducted within the grouting range. The anchor rod has the advantages of accurate positioning, firm anchoring and convenience in maintenance and replacement during later operation.
本发明公开了一种大飞机高速试验滑轨预埋锚固件定位安装的施工方法,包括以下步骤:S1:预埋套管定位安装:测量放样出安装位置,植筋固定,灌浆浇筑;S2:测量放样;S3:刷界面剂;S4:组合件拼装:将螺杆和预埋板及配套组件进行组合拼装,并安放至预埋套管内;S5:工装就位:使用工装对螺杆进行悬吊,采用测量仪器对工装的轴线、高程进行精确调整;S6:组合件精调定位:采对螺杆进行逐个精调,对螺杆的垂直度及预埋板的平整度进行全面复核;S7:预埋板固定:采用钢筋对预埋板进行焊接固定;S8:二次灌浆:在灌浆范围内注浆。具有定位精准、锚固牢固、后期运营时方便维修更换的优点。
Construction method for positioning and mounting pre-embedded anchoring parts of large aircraft high-speed test sliding rail
一种大飞机高速试验滑轨预埋锚固件定位安装的施工方法
LYU MAOFENG (Autor:in) / XU WEN (Autor:in) / HE WEI (Autor:in) / DENG XIAOYONG (Autor:in) / ZHANG NING (Autor:in) / HU CHENG (Autor:in) / HUANG YIWEI (Autor:in) / LI DONGHAI (Autor:in) / WU YANBIN (Autor:in) / YIN QIJIA (Autor:in)
11.06.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for positioning and installing large aircraft high-speed test sliding rail
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Slideway mounting device for high-speed rail swivel bridge construction
Europäisches Patentamt | 2021
|Precise positioning and mounting construction process for large-diameter conical embedded part
Europäisches Patentamt | 2022
|Embedded bolt positioning and mounting device and construction method thereof
Europäisches Patentamt | 2022
|