The invention provides a support erecting method, and relates to the technical field of bridge construction. The support erecting method comprises the steps that inserting and driving information of a support erecting area is obtained according to exploration data, and steel pipe piles at the corresponding positions are transversely cut into first piles and second piles one by one according to the inserting and driving information; the first pile is inserted into the mounting position corresponding to the steel pipe pile, and a first support comprising a second pile is erected; and the first support is hoisted to the preset position in butt joint with the first pile, and the first pile and the second pile are fixed through the fixing structure to complete erecting of the target support. According to the embodiment of the invention, the bracket can be split into the first pile needing to be inserted and driven and the first bracket capable of being mounted on land, so that the erection of a bracket structure part is completed in an area outside the water surface, the time of overwater or underwater operation is effectively shortened, the construction cost is reduced, the risk is small, and the bracket erection progress is improved.
本申请提供了一种支架搭设方法,涉及桥梁施工技术领域。该支架搭设方法,包括:根据勘探数据获取支架搭设区域的插打信息,根据插打信息将对应位置的钢管桩逐一横向切割为第一桩、第二桩;将第一桩插入钢管桩对应的安装位置,并搭设包括第二桩的第一支架;将第一支架吊装至与第一桩对接的预设位置,利用固定结构固定第一桩和第二桩,以完成目标支架的搭设。本申请实施例能够将支架拆分为需要插打的第一桩以及可以陆上安装的第一支架,从而在水面以外的区域完成支架结构部分的搭设,有效减少水上或水中作业的时间,降低施工成本,风险小且提升支架搭设进度。
Support erecting method
The invention provides a support erecting method, and relates to the technical field of bridge construction. The support erecting method comprises the steps that inserting and driving information of a support erecting area is obtained according to exploration data, and steel pipe piles at the corresponding positions are transversely cut into first piles and second piles one by one according to the inserting and driving information; the first pile is inserted into the mounting position corresponding to the steel pipe pile, and a first support comprising a second pile is erected; and the first support is hoisted to the preset position in butt joint with the first pile, and the first pile and the second pile are fixed through the fixing structure to complete erecting of the target support. According to the embodiment of the invention, the bracket can be split into the first pile needing to be inserted and driven and the first bracket capable of being mounted on land, so that the erection of a bracket structure part is completed in an area outside the water surface, the time of overwater or underwater operation is effectively shortened, the construction cost is reduced, the risk is small, and the bracket erection progress is improved.
本申请提供了一种支架搭设方法,涉及桥梁施工技术领域。该支架搭设方法,包括:根据勘探数据获取支架搭设区域的插打信息,根据插打信息将对应位置的钢管桩逐一横向切割为第一桩、第二桩;将第一桩插入钢管桩对应的安装位置,并搭设包括第二桩的第一支架;将第一支架吊装至与第一桩对接的预设位置,利用固定结构固定第一桩和第二桩,以完成目标支架的搭设。本申请实施例能够将支架拆分为需要插打的第一桩以及可以陆上安装的第一支架,从而在水面以外的区域完成支架结构部分的搭设,有效减少水上或水中作业的时间,降低施工成本,风险小且提升支架搭设进度。
Support erecting method
支架搭设方法
HE JUN (Autor:in) / WU JIAN (Autor:in) / HUANG KAIKAI (Autor:in) / ZHENG DENGMING (Autor:in) / YUAN XIAONING (Autor:in)
11.06.2024
Patent
Elektronische Ressource
Chinesisch
Erecting mechanism, erecting device and bridge erecting vehicle
Europäisches Patentamt | 2021
|Construction support system and erecting method thereof
Europäisches Patentamt | 2023
|Erecting method and dismantling method of bridge support