Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete point-division compacting mechanism and method for building construction
The invention relates to the technical field of building construction, in particular to a concrete point-division compacting mechanism for building construction, which comprises a movable seat, two groups of symmetrically arranged guide rails are slidably mounted on the upper end surface of the movable seat, and the exteriors of the two groups of guide rails are jointly connected with a plurality of combination templates. The movable moving assembly and the compacting assembly are arranged to be matched, and concrete can be vibrated and compacted at different points when the bearing column is poured in a construction mode that multiple combined formworks are spliced and combined; on one hand, the point-by-point vibrating compaction mode can avoid purchasing vibrating rods with different models and lengths when construction is carried out on bearing columns with different heights, and on the other hand, the vibrating rods can be prevented from being transversely clamped in the bearing columns and left in the bearing columns due to the fact that the vibrating rods are difficult to take out when being used. And the vibration rod left in the bearing column can cause waste on one hand, and can influence the structural strength of the bearing column on the other hand.
本发明涉及建筑施工技术领域,具体地公开了一种建筑施工用混凝土分点密实机构,包括活动座,所述活动座的上端面滑动安装有两组对称设置的导轨,两组导轨的外部共同连接有多组合模板。本发明通过设置可移动的移动组件和密实组件配合,可通过多块组合模板拼接组合的施工方式实现对承重柱在浇筑时的混凝土进行分点振捣密实,分点振捣密实的方式一方面可避免在对不同高度的承重柱进行施工需要购买不同型号长度的振动棒,另一方面也可防止振动棒在使用时打横进而卡在承重柱的内部难以取出导致遗留在承重柱的内部,而遗留在承重柱内部的振动棒一方面会造成浪费,另一方面也会影响承重柱的结构强度。
Concrete point-division compacting mechanism and method for building construction
The invention relates to the technical field of building construction, in particular to a concrete point-division compacting mechanism for building construction, which comprises a movable seat, two groups of symmetrically arranged guide rails are slidably mounted on the upper end surface of the movable seat, and the exteriors of the two groups of guide rails are jointly connected with a plurality of combination templates. The movable moving assembly and the compacting assembly are arranged to be matched, and concrete can be vibrated and compacted at different points when the bearing column is poured in a construction mode that multiple combined formworks are spliced and combined; on one hand, the point-by-point vibrating compaction mode can avoid purchasing vibrating rods with different models and lengths when construction is carried out on bearing columns with different heights, and on the other hand, the vibrating rods can be prevented from being transversely clamped in the bearing columns and left in the bearing columns due to the fact that the vibrating rods are difficult to take out when being used. And the vibration rod left in the bearing column can cause waste on one hand, and can influence the structural strength of the bearing column on the other hand.
本发明涉及建筑施工技术领域,具体地公开了一种建筑施工用混凝土分点密实机构,包括活动座,所述活动座的上端面滑动安装有两组对称设置的导轨,两组导轨的外部共同连接有多组合模板。本发明通过设置可移动的移动组件和密实组件配合,可通过多块组合模板拼接组合的施工方式实现对承重柱在浇筑时的混凝土进行分点振捣密实,分点振捣密实的方式一方面可避免在对不同高度的承重柱进行施工需要购买不同型号长度的振动棒,另一方面也可防止振动棒在使用时打横进而卡在承重柱的内部难以取出导致遗留在承重柱的内部,而遗留在承重柱内部的振动棒一方面会造成浪费,另一方面也会影响承重柱的结构强度。
Concrete point-division compacting mechanism and method for building construction
一种建筑施工用混凝土分点密实机构及方法
MA BINGHUI (Autor:in) / CAO BING (Autor:in) / WANG HAIHUA (Autor:in) / PENG GANG (Autor:in) / WANG JIAN (Autor:in)
11.06.2024
Patent
Elektronische Ressource
Chinesisch
Concrete point-division compacting device and using method thereof
Europäisches Patentamt | 2023
|SELF-COMPACTING CONCRETE - Self-compacting concrete at Millennium Point
Online Contents | 2000
|Concrete point compacting mechanism capable of improving local compactness
Europäisches Patentamt | 2020
|Self-compacting concrete at Millennium Point
British Library Online Contents | 2000
|