Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rib penetrating guide device for mounting prefabricated hollow superposed shear wall
The invention provides a rib penetrating guide device for mounting a prefabricated hollow superposed shear wall, which comprises a guide device body, and the guide device body is formed by detachably and rotatably connecting a first guide part and a second guide part; the device body has a first state and a second state, the first state is that the first guide part and the second guide part are connected in a buckled mode to form a rib penetrating channel, the upper portion of the first guide part and the upper portion of the second guide part are connected with a hole channel of the corrugated pipe in a clamped mode, and the inner diameter of the lower portion of the rib penetrating channel is gradually increased from top to bottom. The device body has higher adaptability, steel bars can be effectively guided to penetrate no matter the diameter of the steel bars changes or the steel bar penetrating angle is finely adjusted, the requirement for the positioning precision of steel bar penetrating is low, the construction difficulty is lowered, and the stability and efficiency of steel bar penetrating operation are improved; in the second state, the first guide part is separated from the second guide part, the first guide part and the second guide part are separated from the corrugated pipe, and the corrugated pipe can be conveniently disassembled after construction is completed.
本发明提供了一种预制空心叠合剪力墙安装用穿筋引导装置,包括引导装置本体,引导装置本体由第一引导部和第二引导部可分离式的转动连接组成;装置本体具有第一状态和第二状态,第一状态为第一引导部和第二引导部扣合连接形成穿筋通道,第一引导部和第二引导部的上部分别与波纹管的孔道卡接连接的状态,穿筋通道的下部内径自上至下递增,使得装置本体具有更强的适应性,无论是钢筋的直径变化还是穿筋角度的微调,都能够有效引导钢筋穿入,穿筋的定位精度要求低,降低了施工难度,提高穿筋作业的稳定性和效率;第二状态为第一引导部和第二引导部分离,第一引导部和第二引导部脱离波纹管的状态,施工完成后可以方便地拆除。
Rib penetrating guide device for mounting prefabricated hollow superposed shear wall
The invention provides a rib penetrating guide device for mounting a prefabricated hollow superposed shear wall, which comprises a guide device body, and the guide device body is formed by detachably and rotatably connecting a first guide part and a second guide part; the device body has a first state and a second state, the first state is that the first guide part and the second guide part are connected in a buckled mode to form a rib penetrating channel, the upper portion of the first guide part and the upper portion of the second guide part are connected with a hole channel of the corrugated pipe in a clamped mode, and the inner diameter of the lower portion of the rib penetrating channel is gradually increased from top to bottom. The device body has higher adaptability, steel bars can be effectively guided to penetrate no matter the diameter of the steel bars changes or the steel bar penetrating angle is finely adjusted, the requirement for the positioning precision of steel bar penetrating is low, the construction difficulty is lowered, and the stability and efficiency of steel bar penetrating operation are improved; in the second state, the first guide part is separated from the second guide part, the first guide part and the second guide part are separated from the corrugated pipe, and the corrugated pipe can be conveniently disassembled after construction is completed.
本发明提供了一种预制空心叠合剪力墙安装用穿筋引导装置,包括引导装置本体,引导装置本体由第一引导部和第二引导部可分离式的转动连接组成;装置本体具有第一状态和第二状态,第一状态为第一引导部和第二引导部扣合连接形成穿筋通道,第一引导部和第二引导部的上部分别与波纹管的孔道卡接连接的状态,穿筋通道的下部内径自上至下递增,使得装置本体具有更强的适应性,无论是钢筋的直径变化还是穿筋角度的微调,都能够有效引导钢筋穿入,穿筋的定位精度要求低,降低了施工难度,提高穿筋作业的稳定性和效率;第二状态为第一引导部和第二引导部分离,第一引导部和第二引导部脱离波纹管的状态,施工完成后可以方便地拆除。
Rib penetrating guide device for mounting prefabricated hollow superposed shear wall
一种预制空心叠合剪力墙安装用穿筋引导装置
NI KUN (Autor:in) / ZHANG XIANLAI (Autor:in) / TONG LIN (Autor:in) / LIANG XU (Autor:in) / CHEN XIWANG (Autor:in) / JING RUI (Autor:in) / DAI JIALONG (Autor:in) / QI MENG (Autor:in)
14.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Mounting device of prefabricated assembly type superposed beam
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Prefabricated superimposed shear wall mounting system and method
Europäisches Patentamt | 2021
|Construction method of prefabricated hollow laminated shear wall
Europäisches Patentamt | 2023
|