Bridge capping beam construction cross-core rod dismantling method
The invention provides a bridge cover beam construction cross-core rod dismantling method which comprises the steps that before a cross-core rod hole is in place, a through inclined hole is formed in one end of a cross-core rod, and a hoisting hole is formed in the other end of the cross-core rod; a pulling rope is arranged in the inclined hole in a penetrating manner, and one end of the pulling rope is knotted and fixed at the end part of the core penetrating rod; a lifting rope is arranged in the lifting hole in a penetrating manner, and one end of the lifting rope is knotted and fixed at the end part of the core penetrating rod; when the hole of the cross-core rod is in place, one end of the cross-core rod and one end of the traction rope are plugged into the pier column preformed hole PVC pipe together; when the cross-core rod is disassembled, firstly, one end, close to the lifting rope, of the cross-core rod is sleeved with a flared pipe, an auxiliary rope is fixed to the flared pipe, and the other end of the auxiliary rope is tied to the top of the cover beam; reserving a certain length of the lifting rope, and tying the other end of the lifting rope on the top of the capping beam; an operator pulls the traction rope at the top of the cover beam, and the cross-core rod is slowly pulled out; after the cross-core rod is pulled out, the cross-core rod is lowered to the ground through the lifting rope. The method has the advantages of simple operation, safety, reliability, high efficiency and the like.
本发明提供的一种桥梁盖梁施工穿心棒拆除方法,包括穿心棒孔洞就位之前,在穿心棒的一端开设有贯穿的斜孔,另一端开设有吊装孔;在所述斜孔内穿设有牵引绳,且所述牵引绳的一端在穿心棒的端部打结固定;在所述吊装孔内穿设有吊绳,且所述吊绳的一端在穿心棒的端部打结固定;穿心棒孔洞就位时,将穿心棒和牵引绳的一端一起塞入墩柱预留孔PVC管内;穿心棒拆卸时,先在穿心棒靠近吊绳一端套设喇叭管,喇叭管上固定有辅助绳,且所述辅助绳的另一端系在盖梁顶;将吊绳预留一定长度,另一端也系在盖梁顶;作业人员在盖梁顶拉动牵引绳,缓慢将穿心棒拔出;穿心棒拔出后,利用吊绳将穿心棒下放至地面。本发明方法具有操作简便、安全可靠、效率高等优点。
Bridge capping beam construction cross-core rod dismantling method
The invention provides a bridge cover beam construction cross-core rod dismantling method which comprises the steps that before a cross-core rod hole is in place, a through inclined hole is formed in one end of a cross-core rod, and a hoisting hole is formed in the other end of the cross-core rod; a pulling rope is arranged in the inclined hole in a penetrating manner, and one end of the pulling rope is knotted and fixed at the end part of the core penetrating rod; a lifting rope is arranged in the lifting hole in a penetrating manner, and one end of the lifting rope is knotted and fixed at the end part of the core penetrating rod; when the hole of the cross-core rod is in place, one end of the cross-core rod and one end of the traction rope are plugged into the pier column preformed hole PVC pipe together; when the cross-core rod is disassembled, firstly, one end, close to the lifting rope, of the cross-core rod is sleeved with a flared pipe, an auxiliary rope is fixed to the flared pipe, and the other end of the auxiliary rope is tied to the top of the cover beam; reserving a certain length of the lifting rope, and tying the other end of the lifting rope on the top of the capping beam; an operator pulls the traction rope at the top of the cover beam, and the cross-core rod is slowly pulled out; after the cross-core rod is pulled out, the cross-core rod is lowered to the ground through the lifting rope. The method has the advantages of simple operation, safety, reliability, high efficiency and the like.
本发明提供的一种桥梁盖梁施工穿心棒拆除方法,包括穿心棒孔洞就位之前,在穿心棒的一端开设有贯穿的斜孔,另一端开设有吊装孔;在所述斜孔内穿设有牵引绳,且所述牵引绳的一端在穿心棒的端部打结固定;在所述吊装孔内穿设有吊绳,且所述吊绳的一端在穿心棒的端部打结固定;穿心棒孔洞就位时,将穿心棒和牵引绳的一端一起塞入墩柱预留孔PVC管内;穿心棒拆卸时,先在穿心棒靠近吊绳一端套设喇叭管,喇叭管上固定有辅助绳,且所述辅助绳的另一端系在盖梁顶;将吊绳预留一定长度,另一端也系在盖梁顶;作业人员在盖梁顶拉动牵引绳,缓慢将穿心棒拔出;穿心棒拔出后,利用吊绳将穿心棒下放至地面。本发明方法具有操作简便、安全可靠、效率高等优点。
Bridge capping beam construction cross-core rod dismantling method
一种桥梁盖梁施工穿心棒拆除方法
CHEN YUAN (Autor:in) / CAO SONG (Autor:in) / CHENG WEI (Autor:in) / HAN FENGYOU (Autor:in)
18.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Main bridge continuous beam dismantling construction method
Europäisches Patentamt | 2024
|Construction method for capping beam of cross-sea bridge
Europäisches Patentamt | 2023
|Construction method for dismantling precast beam old bridge
Europäisches Patentamt | 2022
|Bailey beam dismantling construction method in bridge engineering
Europäisches Patentamt | 2020
|