Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a building green heat insulation wall, and relates to the field of heat insulation walls, the building green heat insulation wall comprises a wall body and a combined butt joint piece, the combined butt joint piece is arranged on the outer side of the wall body, and the combined butt joint piece is used for positioning and butt joint of the wall body; a penetrating butt joint piece is fixed to the outer side of the combined butt joint piece. The building green heat insulation wall is provided with the auxiliary positioning structure, in the process that a plurality of wall bodies need to be assembled, the assembling precision, levelness and the like of the wall bodies can be guaranteed only through combination of the combined butt joint parts and the penetrating butt joint parts, and through cooperation of penetrating and penetrating of the nested butt joint parts of the nested penetrating structures, the assembling precision and the assembling levelness of the wall bodies can be guaranteed. The embedded butt joint piece is made to make contact with the abutting butt joint piece and then apply pressure to the first air bag synchronously, the first air bag conducts air supply treatment on the interior of the second air bag through the air conveying hose, the expanded second air bag pushes the locking butt joint piece to move downwards to achieve the locking state, and therefore self-locking type assembly butt joint of the multiple wall bodies is achieved.
本发明公开了一种建筑绿色隔热墙体,涉及隔热墙体领域,包括墙体本体和组合对接件,所述墙体本体的外侧设置有组合对接件,用于对彼此墙体本体之间的定位对接;所述组合对接件的外侧固定有贯穿对接件。该建筑绿色隔热墙体,设置有辅助定位结构,需要对多个墙体本体进行组装的过程中,只需通过组合对接件与贯穿对接件之间的组合,即可保证彼此墙体本体之间的组装精准度与水平度等,并且配合嵌套贯穿结构的嵌套对接件的穿插贯穿,让嵌套对接件接触到抵触对接件后对第一气囊同步施压,且第一气囊通过输气软管向第二气囊内部进行供气处理,并且膨胀的第二气囊推动锁合对接件下移实现锁合状态,从而实现多个墙体本体的自锁式组装对接。
The invention discloses a building green heat insulation wall, and relates to the field of heat insulation walls, the building green heat insulation wall comprises a wall body and a combined butt joint piece, the combined butt joint piece is arranged on the outer side of the wall body, and the combined butt joint piece is used for positioning and butt joint of the wall body; a penetrating butt joint piece is fixed to the outer side of the combined butt joint piece. The building green heat insulation wall is provided with the auxiliary positioning structure, in the process that a plurality of wall bodies need to be assembled, the assembling precision, levelness and the like of the wall bodies can be guaranteed only through combination of the combined butt joint parts and the penetrating butt joint parts, and through cooperation of penetrating and penetrating of the nested butt joint parts of the nested penetrating structures, the assembling precision and the assembling levelness of the wall bodies can be guaranteed. The embedded butt joint piece is made to make contact with the abutting butt joint piece and then apply pressure to the first air bag synchronously, the first air bag conducts air supply treatment on the interior of the second air bag through the air conveying hose, the expanded second air bag pushes the locking butt joint piece to move downwards to achieve the locking state, and therefore self-locking type assembly butt joint of the multiple wall bodies is achieved.
本发明公开了一种建筑绿色隔热墙体,涉及隔热墙体领域,包括墙体本体和组合对接件,所述墙体本体的外侧设置有组合对接件,用于对彼此墙体本体之间的定位对接;所述组合对接件的外侧固定有贯穿对接件。该建筑绿色隔热墙体,设置有辅助定位结构,需要对多个墙体本体进行组装的过程中,只需通过组合对接件与贯穿对接件之间的组合,即可保证彼此墙体本体之间的组装精准度与水平度等,并且配合嵌套贯穿结构的嵌套对接件的穿插贯穿,让嵌套对接件接触到抵触对接件后对第一气囊同步施压,且第一气囊通过输气软管向第二气囊内部进行供气处理,并且膨胀的第二气囊推动锁合对接件下移实现锁合状态,从而实现多个墙体本体的自锁式组装对接。
HEAT INSULATION METHOD FOR BUILDING WALL, HEAT INSULATION BUILDING WALL, AND COATING APPARATUS
Europäisches Patentamt | 2016
|