Aluminum-wood combined construction method
The invention relates to an aluminum-wood combined construction method, and relates to the field of building construction.The aluminum-wood combined construction method comprises the following steps that S1, a building structure is analyzed, and a standard structure layer and a non-standard structure layer are determined; s2, comparing the standard layer structure with the non-standard layer structure, and determining different parts and same parts of the standard layer structure and the non-standard layer structure; s3, adjusting battens are manufactured according to the different parts, and universal aluminum molds are manufactured according to the same parts; s4, the universal aluminum molds and the adjusting battens enter the site, the universal aluminum molds are in lap joint, and the adjusting battens are connected with the corresponding universal aluminum molds; s5, mounting a general aluminum mold and adjusting a support of the batten; s6, concrete pouring; and S7, the universal aluminum mold and the adjusting batten are dismantled. According to the construction method, the general aluminum mold and the adjusting batten are flexibly combined, the construction requirement of a standard layer structure can be met, and the construction requirement of a non-standard layer structure can also be met.
本申请涉及一种铝木结合的施工方法,涉及建筑施工领域,铝木结合的施工方法包括以下步骤:S1:对建筑结构进行分析,确定标准结构层和非标准结构层;S2:对比标准层结构和非标准层结构,确定标准层结构和非标准层结构的差异部位和相同部位;S3:根据差异部位制作调节木方,根据相同部位制作通用铝模;S4:通用铝模和调节木方进场,搭接通用铝模,将调节木方与对应的通用铝模进行连接;S5:安装通用铝模和调节木方的支护;S6:混凝土浇筑;S7:拆除通用铝模和调节木方。本施工方法将通用铝模和调节木方进行了灵活结合,既可满足标准层结构的施工要求,也可满足非标层结构的施工要求。
Aluminum-wood combined construction method
The invention relates to an aluminum-wood combined construction method, and relates to the field of building construction.The aluminum-wood combined construction method comprises the following steps that S1, a building structure is analyzed, and a standard structure layer and a non-standard structure layer are determined; s2, comparing the standard layer structure with the non-standard layer structure, and determining different parts and same parts of the standard layer structure and the non-standard layer structure; s3, adjusting battens are manufactured according to the different parts, and universal aluminum molds are manufactured according to the same parts; s4, the universal aluminum molds and the adjusting battens enter the site, the universal aluminum molds are in lap joint, and the adjusting battens are connected with the corresponding universal aluminum molds; s5, mounting a general aluminum mold and adjusting a support of the batten; s6, concrete pouring; and S7, the universal aluminum mold and the adjusting batten are dismantled. According to the construction method, the general aluminum mold and the adjusting batten are flexibly combined, the construction requirement of a standard layer structure can be met, and the construction requirement of a non-standard layer structure can also be met.
本申请涉及一种铝木结合的施工方法,涉及建筑施工领域,铝木结合的施工方法包括以下步骤:S1:对建筑结构进行分析,确定标准结构层和非标准结构层;S2:对比标准层结构和非标准层结构,确定标准层结构和非标准层结构的差异部位和相同部位;S3:根据差异部位制作调节木方,根据相同部位制作通用铝模;S4:通用铝模和调节木方进场,搭接通用铝模,将调节木方与对应的通用铝模进行连接;S5:安装通用铝模和调节木方的支护;S6:混凝土浇筑;S7:拆除通用铝模和调节木方。本施工方法将通用铝模和调节木方进行了灵活结合,既可满足标准层结构的施工要求,也可满足非标层结构的施工要求。
Aluminum-wood combined construction method
一种铝木结合的施工方法
XU SHIWEI (Autor:in) / CHEN XIANMING (Autor:in) / XIANG JUN (Autor:in) / HOU LEI (Autor:in) / WU ZEXING (Autor:in) / MA GUODONG (Autor:in)
25.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Aluminum-wood combined formwork reinforcing construction method
Europäisches Patentamt | 2023
|Aluminum alloy formwork and wood formwork combined structure and construction method
Europäisches Patentamt | 2023
|Aluminum-wood combined rapid turnover construction method for high-rise building
Europäisches Patentamt | 2024
|Aluminum alloy formwork and wood formwork combined structure and construction method
Europäisches Patentamt | 2021
|