Aluminum-wood combined rapid turnover construction method for high-rise building
The invention discloses a high-rise building aluminum-wood combined rapid turnover construction method which comprises the following steps: 1, measuring and setting out according to the drawing size of a building structure, and configuring a vertical wood template and a horizontal aluminum template; 2, after acceptance of the vertical steel bar concealed project is completed, vertical wood formwork construction of a vertical structure is conducted; 3, after construction of the vertical wood formwork is completed, construction of a horizontal structural beam and a floor horizontal aluminum formwork is conducted; 4, the vertical wood formworks and the horizontal aluminum formworks are connected and fixed, and the formworks of the vertical structures and the formworks of the horizontal structures are connected into a whole; 5, adjusting the vertical and flat elevation of the vertical wood formwork and the horizontal aluminum formwork, and performing concrete pouring after upper steel bar construction and acceptance; and 6, after the concrete reaches a certain strength, the vertical wood formworks and the horizontal aluminum formworks are dismantled, the vertical rods are reserved, and the vertical wood formworks and the horizontal aluminum formworks are turned upwards. The invention relates to the technical field of building construction and can solve the problem that in the prior art, construction of a wood pattern system is not economical.
本发明公开了一种高层建筑铝木结合的快速周转施工方法,包括步骤:1:根据建筑结构图纸尺寸进行测量放线,配置竖向木模板和水平铝模板;2:竖向钢筋隐蔽工程验收完毕后,进行竖向结构的竖向木模板施工;3:竖向木模板施工完成后,进行水平结构梁和楼板水平铝模板施工;4:将竖向木模板和水平铝模板连接固定,使竖向结构和水平结构的模板连接形成一个整体;5:进行竖向木模板和水平铝模板的垂直和平整标高的调整,上部钢筋施工并经验收后进行混凝土浇筑;6:待混凝土达到一定强度后,拆除竖向木模板和水平铝模板,保留立杆,向上周转竖向木模板和水平铝模板。本发明涉及建筑施工技术领域,能够解决现有技术中木模体系施工不经济的问题。
Aluminum-wood combined rapid turnover construction method for high-rise building
The invention discloses a high-rise building aluminum-wood combined rapid turnover construction method which comprises the following steps: 1, measuring and setting out according to the drawing size of a building structure, and configuring a vertical wood template and a horizontal aluminum template; 2, after acceptance of the vertical steel bar concealed project is completed, vertical wood formwork construction of a vertical structure is conducted; 3, after construction of the vertical wood formwork is completed, construction of a horizontal structural beam and a floor horizontal aluminum formwork is conducted; 4, the vertical wood formworks and the horizontal aluminum formworks are connected and fixed, and the formworks of the vertical structures and the formworks of the horizontal structures are connected into a whole; 5, adjusting the vertical and flat elevation of the vertical wood formwork and the horizontal aluminum formwork, and performing concrete pouring after upper steel bar construction and acceptance; and 6, after the concrete reaches a certain strength, the vertical wood formworks and the horizontal aluminum formworks are dismantled, the vertical rods are reserved, and the vertical wood formworks and the horizontal aluminum formworks are turned upwards. The invention relates to the technical field of building construction and can solve the problem that in the prior art, construction of a wood pattern system is not economical.
本发明公开了一种高层建筑铝木结合的快速周转施工方法,包括步骤:1:根据建筑结构图纸尺寸进行测量放线,配置竖向木模板和水平铝模板;2:竖向钢筋隐蔽工程验收完毕后,进行竖向结构的竖向木模板施工;3:竖向木模板施工完成后,进行水平结构梁和楼板水平铝模板施工;4:将竖向木模板和水平铝模板连接固定,使竖向结构和水平结构的模板连接形成一个整体;5:进行竖向木模板和水平铝模板的垂直和平整标高的调整,上部钢筋施工并经验收后进行混凝土浇筑;6:待混凝土达到一定强度后,拆除竖向木模板和水平铝模板,保留立杆,向上周转竖向木模板和水平铝模板。本发明涉及建筑施工技术领域,能够解决现有技术中木模体系施工不经济的问题。
Aluminum-wood combined rapid turnover construction method for high-rise building
高层建筑铝木结合的快速周转施工方法
LI CHAOFENG (Autor:in) / ZHENG YUAN (Autor:in) / NI RUI (Autor:in) / YAO ZONGZHENG (Autor:in) / HONG SHICHENG (Autor:in) / WANG LONGFEI (Autor:in) / SUN JINGMING (Autor:in)
06.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Rapid interpenetrating flow construction method for high-rise building
Europäisches Patentamt | 2024
|Aluminum alloy formwork construction method for high-rise building
Europäisches Patentamt | 2022
|Efficient turnover aluminum alloy formwork construction method for building
Europäisches Patentamt | 2023
|Aluminum-wood combined formwork reinforcing construction method
Europäisches Patentamt | 2023
|