Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Buried sewage treatment system and control method thereof
The invention relates to a buried sewage treatment system and a control method thereof, the buried sewage treatment system comprises a sewage treatment tank; the bottom of the sewage treatment tank is fixed on a treatment tank mounting platform, and the treatment tank mounting platform is arranged at the bottom of the pit; the upper end of the sewage treatment tank is provided with a treatment tank clamp, and the treatment tank clamp is connected with a ground anchor structure arranged on the periphery of the sewage treatment tank through a clamp fastener; the liquid level meter I is used for monitoring the liquid level inside the sewage treatment tank; the liquid level meter II is used for monitoring the liquid level outside the sewage treatment tank; and the controller is used for receiving and processing monitoring signals of the two liquid level meters and then controlling a water inlet pump on a water inlet pipeline of the sewage treatment tank to start. The state of the tank body can be monitored in real time, early warning can be performed in time when the state of the tank body is abnormal, deposit withdrawing management personnel can handle in time, and the risk that the tank body floats is avoided.
本发明涉及一种地埋式污水处理系统及其控制方法,地埋式污水处理系统,包括污水处理罐;所述污水处理罐底部固定在处理罐安装平台上,所述处理罐安装平台设在地坑底部;所述污水处理罐上端装有处理罐抱卡,处理罐抱卡经抱卡紧固件与设在污水处理罐外周上的地锚结构连接;还包括用于监测污水处理罐内部液位的液位计一、用于监测污水处理罐外部液位的液位计二及接收两个液位计监测信号处理后控制污水处理罐进水管道上进水泵启动的控制器。可以实时监控罐体状态,同时在罐体状态异常时能够及时预警,提现管理人员及时处理,避免罐体漂浮的风险。
Buried sewage treatment system and control method thereof
The invention relates to a buried sewage treatment system and a control method thereof, the buried sewage treatment system comprises a sewage treatment tank; the bottom of the sewage treatment tank is fixed on a treatment tank mounting platform, and the treatment tank mounting platform is arranged at the bottom of the pit; the upper end of the sewage treatment tank is provided with a treatment tank clamp, and the treatment tank clamp is connected with a ground anchor structure arranged on the periphery of the sewage treatment tank through a clamp fastener; the liquid level meter I is used for monitoring the liquid level inside the sewage treatment tank; the liquid level meter II is used for monitoring the liquid level outside the sewage treatment tank; and the controller is used for receiving and processing monitoring signals of the two liquid level meters and then controlling a water inlet pump on a water inlet pipeline of the sewage treatment tank to start. The state of the tank body can be monitored in real time, early warning can be performed in time when the state of the tank body is abnormal, deposit withdrawing management personnel can handle in time, and the risk that the tank body floats is avoided.
本发明涉及一种地埋式污水处理系统及其控制方法,地埋式污水处理系统,包括污水处理罐;所述污水处理罐底部固定在处理罐安装平台上,所述处理罐安装平台设在地坑底部;所述污水处理罐上端装有处理罐抱卡,处理罐抱卡经抱卡紧固件与设在污水处理罐外周上的地锚结构连接;还包括用于监测污水处理罐内部液位的液位计一、用于监测污水处理罐外部液位的液位计二及接收两个液位计监测信号处理后控制污水处理罐进水管道上进水泵启动的控制器。可以实时监控罐体状态,同时在罐体状态异常时能够及时预警,提现管理人员及时处理,避免罐体漂浮的风险。
Buried sewage treatment system and control method thereof
一种地埋式污水处理系统及其控制方法
HUA KANG (Autor:in) / WANG ZI (Autor:in) / HU LING (Autor:in) / HUA LINGYUN (Autor:in) / CHE YANWEN (Autor:in) / LI RUIJIE (Autor:in) / ZHANG QIANG (Autor:in) / JIAO XIAOSHUANG (Autor:in) / XIN YUEXING (Autor:in) / LIU YISONG (Autor:in)
28.06.2024
Patent
Elektronische Ressource
Chinesisch
Integrated buried sewage treatment prefabricated pump station
Europäisches Patentamt | 2020
|