Hoisting device and method for lower hanging steel beam
The invention relates to the technical field of steel structure installation, in particular to a hoisting device and method for a lower hanging steel beam, the hoisting device comprises a lower hanging steel beam hoisting frame body, a balance weight beam is welded to the bottom of the lower hanging steel beam hoisting frame body, a lifting lug is welded to the top of the lower hanging steel beam hoisting frame body, and a detachable clamping ring is arranged at the end of the lifting lug; and the end side of the clamping ring communicates with a hoisting steel rope, a hanging beam hanging lug is welded to the end of the lower hanging steel beam hoisting frame body, and a groove is formed in the hanging beam hanging lug. According to the hoisting device and method for the lower hanging steel beam, the push rod is pressed to turn over, so that the opening is exposed out of the lifting lug for clamping connection, the clamping ring and the lifting lug are firmly installed, and the situation that the lower hanging steel beam is loosened in the hoisting process and consequently the hoisting stability is affected is avoided; and the balancing weight is stably mounted on the mounting shaft so as to adjust the balance force, so that the hoisting operation is carried out according to the horizontal state of the lower hanging steel beam.
本发明涉及钢结构安装技术领域,具体为一种用于下挂钢梁的吊装装置及方法,包括下挂钢梁吊装架主体,所述下挂钢梁吊装架主体的底部焊接有配重梁,所述下挂钢梁吊装架主体的顶部焊接有吊耳,所述吊耳的端部设有可拆卸的卡环,所述卡环的端侧连通有吊装钢绳,所述下挂钢梁吊装架主体的端部焊接有挂梁挂耳,所述挂梁挂耳的内部开设有凹槽。该一种用于下挂钢梁的吊装装置及方法,按压推杆翻转进而将开口裸露出于吊耳进行卡接,使得卡环与吊耳之间安装牢固,避免吊装的过程中下挂钢梁松脱进而影响吊装的稳定性,根据需求安装配重块,配重块稳定安装在安装轴上进而对平衡力进行调整,使其根据下挂钢梁处于水平状态进行吊装操作。
Hoisting device and method for lower hanging steel beam
The invention relates to the technical field of steel structure installation, in particular to a hoisting device and method for a lower hanging steel beam, the hoisting device comprises a lower hanging steel beam hoisting frame body, a balance weight beam is welded to the bottom of the lower hanging steel beam hoisting frame body, a lifting lug is welded to the top of the lower hanging steel beam hoisting frame body, and a detachable clamping ring is arranged at the end of the lifting lug; and the end side of the clamping ring communicates with a hoisting steel rope, a hanging beam hanging lug is welded to the end of the lower hanging steel beam hoisting frame body, and a groove is formed in the hanging beam hanging lug. According to the hoisting device and method for the lower hanging steel beam, the push rod is pressed to turn over, so that the opening is exposed out of the lifting lug for clamping connection, the clamping ring and the lifting lug are firmly installed, and the situation that the lower hanging steel beam is loosened in the hoisting process and consequently the hoisting stability is affected is avoided; and the balancing weight is stably mounted on the mounting shaft so as to adjust the balance force, so that the hoisting operation is carried out according to the horizontal state of the lower hanging steel beam.
本发明涉及钢结构安装技术领域,具体为一种用于下挂钢梁的吊装装置及方法,包括下挂钢梁吊装架主体,所述下挂钢梁吊装架主体的底部焊接有配重梁,所述下挂钢梁吊装架主体的顶部焊接有吊耳,所述吊耳的端部设有可拆卸的卡环,所述卡环的端侧连通有吊装钢绳,所述下挂钢梁吊装架主体的端部焊接有挂梁挂耳,所述挂梁挂耳的内部开设有凹槽。该一种用于下挂钢梁的吊装装置及方法,按压推杆翻转进而将开口裸露出于吊耳进行卡接,使得卡环与吊耳之间安装牢固,避免吊装的过程中下挂钢梁松脱进而影响吊装的稳定性,根据需求安装配重块,配重块稳定安装在安装轴上进而对平衡力进行调整,使其根据下挂钢梁处于水平状态进行吊装操作。
Hoisting device and method for lower hanging steel beam
一种用于下挂钢梁的吊装装置及方法
ZHANG ZHILI (Autor:in) / SHI JINGBIN (Autor:in) / WANG JUNWEI (Autor:in) / REN JIE (Autor:in) / LYU KUN (Autor:in) / HUANG YUNCHANG (Autor:in) / YU YONG (Autor:in) / WANG XIUJUN (Autor:in) / ZHANG WENBIN (Autor:in)
02.07.2024
Patent