Vertical jacking equipment for sewage pipeline inspection well
The invention discloses vertical jacking equipment for a sewage pipeline inspection well. The vertical jacking equipment comprises a platform stand column, a hydraulic oil cylinder, a counter-force frame and an operation platform. The platform stand column stands at the top end of the counter-force frame, and the operation platform is installed at the top end of the platform stand column. The hydraulic oil cylinder is installed at the top end of the counter-force frame, and the jacking iron is arranged at the telescopic end of the hydraulic oil cylinder. The counter-force frame is arranged, the oil cylinder is installed on the counter-force frame, the load generated when the oil cylinder is jacked is directly transmitted to a pipeline, the operation platform only needs to bear the weight of a vertical jacking pipe joint and constructors, the load of the operation platform is greatly reduced, erecting is easier, the construction efficiency is improved, and the erecting difficulty is reduced; and the construction cost is saved.
本发明公开了一种污水管道检查井垂直顶升设备,包括平台立柱、液压油缸、反力架和操作平台;所述平台立柱立于反力架的顶端,所述操作平台安装于平台立柱的顶端;所述液压油缸安装于反力架的顶端,所述顶铁设置与液压油缸的伸缩端。本发明设置有反力架,并将油缸安装在反力架上,将油缸顶升时的荷载直接传递给管道,操作平台只需承受垂直顶升管节和施工人员的重量,使得操作平台的荷载大大降低,搭设起来更加简单,提高了施工效率,降低了搭建难度,节约了搭建成本。
Vertical jacking equipment for sewage pipeline inspection well
The invention discloses vertical jacking equipment for a sewage pipeline inspection well. The vertical jacking equipment comprises a platform stand column, a hydraulic oil cylinder, a counter-force frame and an operation platform. The platform stand column stands at the top end of the counter-force frame, and the operation platform is installed at the top end of the platform stand column. The hydraulic oil cylinder is installed at the top end of the counter-force frame, and the jacking iron is arranged at the telescopic end of the hydraulic oil cylinder. The counter-force frame is arranged, the oil cylinder is installed on the counter-force frame, the load generated when the oil cylinder is jacked is directly transmitted to a pipeline, the operation platform only needs to bear the weight of a vertical jacking pipe joint and constructors, the load of the operation platform is greatly reduced, erecting is easier, the construction efficiency is improved, and the erecting difficulty is reduced; and the construction cost is saved.
本发明公开了一种污水管道检查井垂直顶升设备,包括平台立柱、液压油缸、反力架和操作平台;所述平台立柱立于反力架的顶端,所述操作平台安装于平台立柱的顶端;所述液压油缸安装于反力架的顶端,所述顶铁设置与液压油缸的伸缩端。本发明设置有反力架,并将油缸安装在反力架上,将油缸顶升时的荷载直接传递给管道,操作平台只需承受垂直顶升管节和施工人员的重量,使得操作平台的荷载大大降低,搭设起来更加简单,提高了施工效率,降低了搭建难度,节约了搭建成本。
Vertical jacking equipment for sewage pipeline inspection well
一种污水管道检查井垂直顶升设备
WEI XUFENG (Autor:in) / GENG XIAOFEI (Autor:in) / LIU ZONGQIN (Autor:in) / LI YANG (Autor:in) / XIANG ZEYONG (Autor:in) / CHEN JIN (Autor:in)
02.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E03F
SEWERS
,
Abwasserkanäle
Vertical prestressed pipeline mud jacking device and mud jacking method thereof
Europäisches Patentamt | 2020
|Sewage delivery pipeline inspection well and construction method
Europäisches Patentamt | 2020
|Inspection well for municipal rainwater and sewage pipeline
Europäisches Patentamt | 2020
|Construction method of domestic sewage pipeline inspection well
Europäisches Patentamt | 2021
|