Construction method of slope drainage culvert pipe
The invention discloses a construction method of a side slope drainage culvert pipe. The inner layer of the composite pipeline is a plastic hose, and the hose has certain rigidity; the outside of the plastic hose is wrapped by two layers of wire meshes, and 4-6 through steel bars are placed between the inner-layer wire mesh and the outer-layer wire mesh; the intervals among the plastic hose, the inner-layer iron wire mesh, the outer-layer iron wire mesh and the through steel wires are preferably expanded by metal rings and are bound and fixed by iron wires, and proper holes for accommodating concrete are reserved; the outermost layer is a plastic template and is fixed on the wall surface of the side slope by nails, fine aggregate concrete is poured into the plastic template, and the wall surface of the side slope is cleaned before pouring so as to be beneficial to concrete bonding; in this way, a reinforced concrete composite pipeline tightly attached to the side slope wall face is formed.
边坡泄水涵管的一种建造方法。这种复合管道的内层是一根塑料软管,该软管具有一定刚度;塑料软管外部由两层铁丝网包裹,内、外层铁丝网之间放置4~6根贯通钢筋;塑料软管、内外层铁丝网与贯通钢丝之间,宜用金属环类撑开间距,用铁丝绑扎固定,预留出容纳混凝土的适当孔隙;最外层是塑料模板,用钉子固定在边坡壁面上,塑料模板内浇筑细石混凝土,浇筑前清洗边坡壁面,以利混凝土粘接;这样,就形成了一条紧贴边坡壁面的钢筋混凝土复合管道。
Construction method of slope drainage culvert pipe
The invention discloses a construction method of a side slope drainage culvert pipe. The inner layer of the composite pipeline is a plastic hose, and the hose has certain rigidity; the outside of the plastic hose is wrapped by two layers of wire meshes, and 4-6 through steel bars are placed between the inner-layer wire mesh and the outer-layer wire mesh; the intervals among the plastic hose, the inner-layer iron wire mesh, the outer-layer iron wire mesh and the through steel wires are preferably expanded by metal rings and are bound and fixed by iron wires, and proper holes for accommodating concrete are reserved; the outermost layer is a plastic template and is fixed on the wall surface of the side slope by nails, fine aggregate concrete is poured into the plastic template, and the wall surface of the side slope is cleaned before pouring so as to be beneficial to concrete bonding; in this way, a reinforced concrete composite pipeline tightly attached to the side slope wall face is formed.
边坡泄水涵管的一种建造方法。这种复合管道的内层是一根塑料软管,该软管具有一定刚度;塑料软管外部由两层铁丝网包裹,内、外层铁丝网之间放置4~6根贯通钢筋;塑料软管、内外层铁丝网与贯通钢丝之间,宜用金属环类撑开间距,用铁丝绑扎固定,预留出容纳混凝土的适当孔隙;最外层是塑料模板,用钉子固定在边坡壁面上,塑料模板内浇筑细石混凝土,浇筑前清洗边坡壁面,以利混凝土粘接;这样,就形成了一条紧贴边坡壁面的钢筋混凝土复合管道。
Construction method of slope drainage culvert pipe
边坡泄水涵管的一种建造方法
LIU ZHAOLANG (Autor:in) / LIU YONGCHANG (Autor:in) / LIU YONGLONG (Autor:in)
02.07.2024
Patent
Elektronische Ressource
Chinesisch