Slope asphalt concrete face rockfill dam construction equipment and construction method
The invention discloses construction equipment and a construction method for a slope asphalt concrete face rockfill dam. The construction equipment comprises a first track beam, a second track beam, a truss, a winch and a vibration roller, the first track beam is arranged at the lower position of the rock-fill dam; the first track beam is arranged at the upper position of the rock-fill dam; the truss comprises a frame body, mounting seats and rollers, two ends of the frame body are fixedly connected with the mounting seats, and the rollers are mounted on the lower portions of the mounting seats; rollers at two ends of the truss are arranged in the track beams; the winch is mounted at the upper end of the truss; the vibrating roller is arranged below the truss and connected with a pull rope of the winch, and the construction method of the slope asphalt concrete face rockfill dam is completed through the construction equipment. According to the method, the winch is used for supporting the vibration roller, operation of a driver is not needed, and the personnel safety risk caused when the driver drives equipment on the rockfill slope is avoided; the whole construction process is higher in mechanization degree and higher in safety, and personnel investment is reduced.
本发明公开了一种斜坡沥青混凝土面板堆石坝施工设备和施工方法,施工设备包括:第一轨道梁、第二轨道梁、桁架、卷扬机和振动碾;第一轨道梁设置在堆石坝的下部位置;第一轨道梁设置在堆石坝的上部位置;桁架包括架体、安装座和滚轮,架体的两端分固定连接安装座,滚轮安装在安装座的下部;桁架两端的滚轮设置在轨道梁内;卷扬机安装在桁架的上端;振动碾设置在桁架的下方,振动碾与卷扬机的拉绳连接,斜坡沥青混凝土面板堆石坝施工方法利用上述施工设备完成。本发明上述方法利用卷扬机托行振动碾不需要驾驶员操作,避免了驾驶员在堆石斜面驾驶设备所存在的人员安全风险;整个施工过程机械化程度更高,安全性更强,减少了人员投入。
Slope asphalt concrete face rockfill dam construction equipment and construction method
The invention discloses construction equipment and a construction method for a slope asphalt concrete face rockfill dam. The construction equipment comprises a first track beam, a second track beam, a truss, a winch and a vibration roller, the first track beam is arranged at the lower position of the rock-fill dam; the first track beam is arranged at the upper position of the rock-fill dam; the truss comprises a frame body, mounting seats and rollers, two ends of the frame body are fixedly connected with the mounting seats, and the rollers are mounted on the lower portions of the mounting seats; rollers at two ends of the truss are arranged in the track beams; the winch is mounted at the upper end of the truss; the vibrating roller is arranged below the truss and connected with a pull rope of the winch, and the construction method of the slope asphalt concrete face rockfill dam is completed through the construction equipment. According to the method, the winch is used for supporting the vibration roller, operation of a driver is not needed, and the personnel safety risk caused when the driver drives equipment on the rockfill slope is avoided; the whole construction process is higher in mechanization degree and higher in safety, and personnel investment is reduced.
本发明公开了一种斜坡沥青混凝土面板堆石坝施工设备和施工方法,施工设备包括:第一轨道梁、第二轨道梁、桁架、卷扬机和振动碾;第一轨道梁设置在堆石坝的下部位置;第一轨道梁设置在堆石坝的上部位置;桁架包括架体、安装座和滚轮,架体的两端分固定连接安装座,滚轮安装在安装座的下部;桁架两端的滚轮设置在轨道梁内;卷扬机安装在桁架的上端;振动碾设置在桁架的下方,振动碾与卷扬机的拉绳连接,斜坡沥青混凝土面板堆石坝施工方法利用上述施工设备完成。本发明上述方法利用卷扬机托行振动碾不需要驾驶员操作,避免了驾驶员在堆石斜面驾驶设备所存在的人员安全风险;整个施工过程机械化程度更高,安全性更强,减少了人员投入。
Slope asphalt concrete face rockfill dam construction equipment and construction method
斜坡沥青混凝土面板堆石坝施工设备和施工方法
WANG FEI (Autor:in) / YANG GUOFU (Autor:in) / CHEN HAO (Autor:in) / TIAN XINGUO (Autor:in) / LIU HONGQIANG (Autor:in) / WANG JIANMENG (Autor:in) / LIU ZHONGHUA (Autor:in) / QI SHICHAO (Autor:in) / HOU LIXIA (Autor:in)
05.07.2024
Patent
Elektronische Ressource
Chinesisch
Protective structure of asphalt concrete face rockfill dam and construction method
Europäisches Patentamt | 2023
|Qingjiang Shuibuya concrete face rockfill dam under construction
British Library Conference Proceedings | 2004
|Fabricated reinforced concrete face rockfill dam and construction method thereof
Europäisches Patentamt | 2024
|Concrete face rockfill dam soft foundation reinforcing structure and construction method
Europäisches Patentamt | 2021
|Concrete faced rockfill dam construction method for rapidly filling rockfill body
Europäisches Patentamt | 2022
|