Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integrated composite thermal insulation wall and construction method
The invention relates to an integrated composite thermal insulation wall and a construction method, and belongs to the technical field of thermal insulation walls.The integrated composite thermal insulation wall comprises a thermal insulation board, a mounting groove is formed in the board face of the thermal insulation board, the integrated composite thermal insulation wall further comprises a mounting base, the mounting base is used for being inserted into the mounting groove, and a first fixing rod is arranged on the mounting base; the first fixing rod is located on the side, away from the heat preservation plate, of the mounting base, a binding steel wire is arranged on the first fixing rod, one end of the binding steel wire is fixedly arranged on the first fixing rod, the other end of the binding steel wire is detachably arranged on the first fixing rod, and the first fixing rod is rotationally arranged on the mounting base; after the free end of the binding steel wire penetrates through the steel reinforcement framework, the free end of the binding steel wire is fixed to the first fixing rod, and then the first fixing rod is rotated so that the heat preservation plate can be fixed to the steel reinforcement framework. The fixing device has the effect of improving the fixing efficiency of the insulation board.
本申请涉及一种一体化复合保温墙体及施工方法,属于保温墙体技术领域,包括保温板,所述保温板的板面上开设有安装槽,还包括安装座,所述安装座用于插接进入安装槽内,所述安装座上设置有第一固定杆,所述第一固定杆位于安装座背离保温板的一侧,所述第一固定杆上设置有绑扎钢丝,所述绑扎钢丝的一端固定设置在第一固定杆上,另一端可拆卸设置在第一固定杆上,所述第一固定杆转动设置在安装座上,所述绑扎钢丝的自由端穿过钢筋骨架后,将绑扎钢丝的自由端固定在第一固定杆上,再转动第一固定杆,以将保温板固定在钢筋骨架上。本申请具有提高保温板固定效率的效果。
Integrated composite thermal insulation wall and construction method
The invention relates to an integrated composite thermal insulation wall and a construction method, and belongs to the technical field of thermal insulation walls.The integrated composite thermal insulation wall comprises a thermal insulation board, a mounting groove is formed in the board face of the thermal insulation board, the integrated composite thermal insulation wall further comprises a mounting base, the mounting base is used for being inserted into the mounting groove, and a first fixing rod is arranged on the mounting base; the first fixing rod is located on the side, away from the heat preservation plate, of the mounting base, a binding steel wire is arranged on the first fixing rod, one end of the binding steel wire is fixedly arranged on the first fixing rod, the other end of the binding steel wire is detachably arranged on the first fixing rod, and the first fixing rod is rotationally arranged on the mounting base; after the free end of the binding steel wire penetrates through the steel reinforcement framework, the free end of the binding steel wire is fixed to the first fixing rod, and then the first fixing rod is rotated so that the heat preservation plate can be fixed to the steel reinforcement framework. The fixing device has the effect of improving the fixing efficiency of the insulation board.
本申请涉及一种一体化复合保温墙体及施工方法,属于保温墙体技术领域,包括保温板,所述保温板的板面上开设有安装槽,还包括安装座,所述安装座用于插接进入安装槽内,所述安装座上设置有第一固定杆,所述第一固定杆位于安装座背离保温板的一侧,所述第一固定杆上设置有绑扎钢丝,所述绑扎钢丝的一端固定设置在第一固定杆上,另一端可拆卸设置在第一固定杆上,所述第一固定杆转动设置在安装座上,所述绑扎钢丝的自由端穿过钢筋骨架后,将绑扎钢丝的自由端固定在第一固定杆上,再转动第一固定杆,以将保温板固定在钢筋骨架上。本申请具有提高保温板固定效率的效果。
Integrated composite thermal insulation wall and construction method
一种一体化复合保温墙体及施工方法
DAI GENYUAN (Autor:in) / TANG LI (Autor:in) / ZHOU ZHENGLIN (Autor:in)
05.07.2024
Patent
Elektronische Ressource
Chinesisch
Composite masonry external wall thermal insulation integrated construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Deformation joint wall thermal insulation integrated construction method
Europäisches Patentamt | 2023
|Outer wall external thermal insulation integrated construction method
Europäisches Patentamt | 2023
|