Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting structure of hanging bracket for bridge swivel closure section construction
The invention discloses a mounting structure of a hanging bracket for bridge swivel closure section construction, and relates to the technical field of bridge construction, the mounting structure comprises a track arranged on the top surface of a bridge, and the length direction of the track is the same as the length direction of the top surface of the bridge; the moving trolley can move along all the rails; the hanging bracket is arranged below a bridge, the hanging bracket is connected with a frame of the mobile vehicle through a plurality of connecting mechanisms, each connecting mechanism comprises a connecting line and a winch fixedly arranged on the mobile vehicle, one end of each connecting line is wound on a winding drum of the corresponding winch, and the other end of each connecting line is connected with the hanging bracket. After the rotating body is in place, the hanging bracket only needs to be moved to the closure section through the moving trolley, the in-place efficiency of the hanging bracket is improved, then the construction efficiency is improved, and the construction period is shortened.
本发明公开一种桥梁转体合龙段施工用吊架的安装结构,涉及桥梁建设技术领域,包括:设置在桥梁顶面上的轨道,所述轨道的长度方向与所述桥梁顶面的长度方向相同;移动车,所述移动车能够沿全部所述轨道移动;吊架,所述吊架设置在桥梁的下方,且所述吊架通过多个连接机构与所述移动车的车架连接,每个所述连接机构都包括连接线和固设在所述移动车上的卷扬机,所述连接线一端卷绕在所述卷扬机的卷筒上、另一端与所述吊架连接。在转体就位后,只需通过移动车将吊架移动到合龙段即可,提高了吊架的到位效率,进而提高了施工效率,缩短了施工工期。
Mounting structure of hanging bracket for bridge swivel closure section construction
The invention discloses a mounting structure of a hanging bracket for bridge swivel closure section construction, and relates to the technical field of bridge construction, the mounting structure comprises a track arranged on the top surface of a bridge, and the length direction of the track is the same as the length direction of the top surface of the bridge; the moving trolley can move along all the rails; the hanging bracket is arranged below a bridge, the hanging bracket is connected with a frame of the mobile vehicle through a plurality of connecting mechanisms, each connecting mechanism comprises a connecting line and a winch fixedly arranged on the mobile vehicle, one end of each connecting line is wound on a winding drum of the corresponding winch, and the other end of each connecting line is connected with the hanging bracket. After the rotating body is in place, the hanging bracket only needs to be moved to the closure section through the moving trolley, the in-place efficiency of the hanging bracket is improved, then the construction efficiency is improved, and the construction period is shortened.
本发明公开一种桥梁转体合龙段施工用吊架的安装结构,涉及桥梁建设技术领域,包括:设置在桥梁顶面上的轨道,所述轨道的长度方向与所述桥梁顶面的长度方向相同;移动车,所述移动车能够沿全部所述轨道移动;吊架,所述吊架设置在桥梁的下方,且所述吊架通过多个连接机构与所述移动车的车架连接,每个所述连接机构都包括连接线和固设在所述移动车上的卷扬机,所述连接线一端卷绕在所述卷扬机的卷筒上、另一端与所述吊架连接。在转体就位后,只需通过移动车将吊架移动到合龙段即可,提高了吊架的到位效率,进而提高了施工效率,缩短了施工工期。
Mounting structure of hanging bracket for bridge swivel closure section construction
一种桥梁转体合龙段施工用吊架的安装结构
RONG XUELIANG (Autor:in) / WANG HUIDONG (Autor:in) / WANG BAOXIAN (Autor:in) / WANG YONGHONG (Autor:in) / ZHAO PIN (Autor:in) / CHEN WEI (Autor:in) / ZHANG YAOHUI (Autor:in) / CHEN JIACHENG (Autor:in) / YANG JIAYU (Autor:in) / ZHANG SHAOBO (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Swivel bridge closure device and swivel bridge closure construction method
Europäisches Patentamt | 2020
|Swivel beam closure section structure and construction method thereof
Europäisches Patentamt | 2021
|Multi-positioning adjustable hanging bracket mounting structure
Europäisches Patentamt | 2021
|Dismantling method of double-layer swivel bridge construction supporting bracket
Europäisches Patentamt | 2023
|Swivel steel structure bridge support mounting device and construction method
Europäisches Patentamt | 2022
|