Method for constructing composite foundation through gravel piles and ballast drainage mode
The invention relates to the technical field of offshore dredger fill sludge foundation treatment construction, in particular to a construction method of a composite foundation with a hillstone layer covered on the upper portion and a sludge layer laid on the lower portion. The invention discloses a method for constructing a composite foundation through gravel piles and ballast drainage. The method comprises the steps that S1, upper covering layer guide hole construction is conducted; s2, constructing gravel piles on a lower silt layer; s3, piling a pile position drainage plate; s4, general ramming treatment of an upper covering layer; s5, shallowly burying a drainage filter screen pipeline; and S6, later settlement and drainage monitoring. According to the method, the composite foundation principle and the drainage consolidation principle are combined and complement each other, the repeated operation cost is reduced, the strength of the pile body and the surrounding soil body is further improved through drainage consolidation, and the bearing capacity of the soft soil composite foundation is further improved.
本发明涉及海上吹填淤泥地基处理施工技术领域,特别适用于一种上覆开山石层下卧淤泥层的复合地基施工方法。一种通过碎石桩及压载排水构建复合地基的方法,包括S1、上部覆盖层引孔施工;S2、下部淤泥层碎石桩施工;S3、桩位排水板打设;S4、上部覆盖层普夯处理;S5、浅埋排水滤网管线;S6、后期沉降、排水监测。本发明将复合地基原理和排水固结原理结合,相辅相成,既减少重复作业成本,又通过排水固结进一步增加桩体和周围土体强度,进一步提升软土复合地基承载力。
Method for constructing composite foundation through gravel piles and ballast drainage mode
The invention relates to the technical field of offshore dredger fill sludge foundation treatment construction, in particular to a construction method of a composite foundation with a hillstone layer covered on the upper portion and a sludge layer laid on the lower portion. The invention discloses a method for constructing a composite foundation through gravel piles and ballast drainage. The method comprises the steps that S1, upper covering layer guide hole construction is conducted; s2, constructing gravel piles on a lower silt layer; s3, piling a pile position drainage plate; s4, general ramming treatment of an upper covering layer; s5, shallowly burying a drainage filter screen pipeline; and S6, later settlement and drainage monitoring. According to the method, the composite foundation principle and the drainage consolidation principle are combined and complement each other, the repeated operation cost is reduced, the strength of the pile body and the surrounding soil body is further improved through drainage consolidation, and the bearing capacity of the soft soil composite foundation is further improved.
本发明涉及海上吹填淤泥地基处理施工技术领域,特别适用于一种上覆开山石层下卧淤泥层的复合地基施工方法。一种通过碎石桩及压载排水构建复合地基的方法,包括S1、上部覆盖层引孔施工;S2、下部淤泥层碎石桩施工;S3、桩位排水板打设;S4、上部覆盖层普夯处理;S5、浅埋排水滤网管线;S6、后期沉降、排水监测。本发明将复合地基原理和排水固结原理结合,相辅相成,既减少重复作业成本,又通过排水固结进一步增加桩体和周围土体强度,进一步提升软土复合地基承载力。
Method for constructing composite foundation through gravel piles and ballast drainage mode
一种通过碎石桩及压载排水方式构建复合地基的方法
XU BINBIN (Autor:in) / JIN ZHONGFU (Autor:in) / YANG RUNLAI (Autor:in) / LI XIAOHUI (Autor:in) / WANG YUEJING (Autor:in) / DAI HAO (Autor:in) / YUAN YAODONG (Autor:in) / LYU TIEBING (Autor:in) / GU JINGTAO (Autor:in) / HUO YANG (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for treating bridgehead soft foundation through gravel compaction piles
Europäisches Patentamt | 2022
|Experimental study on vibration responses of composite foundation of gravel piles
British Library Online Contents | 2005
|Settlement of foundation piles in gravel with water
British Library Conference Proceedings | 2008
|Europäisches Patentamt | 2022
|