Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water-rich area sludge geology cement mixing pile construction device and construction method
The invention relates to the technical field of mixing pile construction, and discloses a water-rich area sludge geology cement mixing pile construction device and method, the device comprises a plurality of water blocking rings and a lowering mechanism, and the lowering mechanism is used for putting the water blocking rings into a drill hole one by one; the lowering mechanism comprises a supporting plate and a lifting part installed on the supporting plate, an open hole is formed in the supporting plate and corresponds to the drill hole, the lifting part can move up and down in the vertical direction, and when the water blocking ring is placed in the drill hole, the lifting part moves downwards to push the water blocking ring into the drill hole. The device has the effect of improving the quality of the mixing pile.
本申请涉及搅拌桩施工的技术领域,公开了一种富水区域淤泥地质水泥搅拌桩施工装置及施工方法,装置包括多个阻水环和下放机构,所述下放机构用于将所述阻水环逐一的放入钻孔中;所述下放机构包括支撑板以及安装于所述支撑板上的升降件,所述支撑板上开设有开孔,所述开孔和钻孔相对应,所述升降件能够于沿竖直方向上下运动,当所述阻水环放置于钻孔中时,所述升降件向下运动将所述阻水环推入钻孔中。本申请具有能够提高搅拌桩质量的效果。
Water-rich area sludge geology cement mixing pile construction device and construction method
The invention relates to the technical field of mixing pile construction, and discloses a water-rich area sludge geology cement mixing pile construction device and method, the device comprises a plurality of water blocking rings and a lowering mechanism, and the lowering mechanism is used for putting the water blocking rings into a drill hole one by one; the lowering mechanism comprises a supporting plate and a lifting part installed on the supporting plate, an open hole is formed in the supporting plate and corresponds to the drill hole, the lifting part can move up and down in the vertical direction, and when the water blocking ring is placed in the drill hole, the lifting part moves downwards to push the water blocking ring into the drill hole. The device has the effect of improving the quality of the mixing pile.
本申请涉及搅拌桩施工的技术领域,公开了一种富水区域淤泥地质水泥搅拌桩施工装置及施工方法,装置包括多个阻水环和下放机构,所述下放机构用于将所述阻水环逐一的放入钻孔中;所述下放机构包括支撑板以及安装于所述支撑板上的升降件,所述支撑板上开设有开孔,所述开孔和钻孔相对应,所述升降件能够于沿竖直方向上下运动,当所述阻水环放置于钻孔中时,所述升降件向下运动将所述阻水环推入钻孔中。本申请具有能够提高搅拌桩质量的效果。
Water-rich area sludge geology cement mixing pile construction device and construction method
富水区域淤泥地质水泥搅拌桩施工装置及施工方法
WANG YAO (Autor:in) / WU JINGHUA (Autor:in) / YANG ZHENQIN (Autor:in) / ZHANG FENG (Autor:in) / XU HONGGUANG (Autor:in) / GUO XIAO (Autor:in) / JIANG NA (Autor:in) / ZHOU YONGXIANG (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Segmented cement mixing pile construction device and method in sludge environment
Europäisches Patentamt | 2023
|Cement mixing pile machine and cement mixing pile construction method
Europäisches Patentamt | 2024
|