Pitched roof parapet wall formwork system and construction method
The pitched roof parapet wall formwork system comprises a bottom formwork, a main force frame and an upper suspension formwork, the main force frame is arranged on one side of the bottom formwork, and the upper suspension formwork is arranged above the bottom formwork and connected with the upper end of the main force frame. The bottom formwork comprises a supporting seat and a plurality of bottom formworks installed at the upper end of the supporting seat, and the main force frame comprises at least two main force rods vertically arranged side by side and a connecting transverse rod used for being connected with the main force rods. The upper suspension formwork comprises horizontal suspension rods connected with the upper ends of the corresponding main force rods and inclined suspension rods connected with the corresponding horizontal suspension rods, the inclined suspension rods and the horizontal suspension rods are arranged in a crossed mode, and limiting cross rods are installed at the two opposite included angles. The inclined suspension rod extends to the position above the bottom mold plate, and the lower side of the inclined suspension rod is connected with a plurality of upper mold plates through a plurality of adsorbers. The problem that an existing pitched roof parapet wall concrete pouring formwork cannot be stably and rapidly installed can be solved.
本发明公开了一种坡屋面女儿墙模架系统及施工方法,包括底模架、主力架和上悬模架,所述的主力架设置在底模架的一侧,上悬模架设置在底模架的上方,且与主力架的上端相连,所述的底模架包括支撑座和安装在所述支撑座上端的若干底模板,所述的主力架包括至少两根并排竖向设置的主力杆和用于连接主力杆的连接横杆,所述的上悬模架包括与对应的主力杆的上端相连的水平悬杆和与对应的水平悬杆相连的倾斜悬杆,所述的倾斜悬杆与水平悬杆呈交叉设置,且两个相对的夹角处安装有限位横杆,所述的倾斜悬杆延伸至底模板的上方且倾斜悬杆的下侧通过若干吸附器连接有若干上模板。本发明可以解决现在坡屋面女儿墙混凝土浇筑模板无法稳定快速安装的问题。
Pitched roof parapet wall formwork system and construction method
The pitched roof parapet wall formwork system comprises a bottom formwork, a main force frame and an upper suspension formwork, the main force frame is arranged on one side of the bottom formwork, and the upper suspension formwork is arranged above the bottom formwork and connected with the upper end of the main force frame. The bottom formwork comprises a supporting seat and a plurality of bottom formworks installed at the upper end of the supporting seat, and the main force frame comprises at least two main force rods vertically arranged side by side and a connecting transverse rod used for being connected with the main force rods. The upper suspension formwork comprises horizontal suspension rods connected with the upper ends of the corresponding main force rods and inclined suspension rods connected with the corresponding horizontal suspension rods, the inclined suspension rods and the horizontal suspension rods are arranged in a crossed mode, and limiting cross rods are installed at the two opposite included angles. The inclined suspension rod extends to the position above the bottom mold plate, and the lower side of the inclined suspension rod is connected with a plurality of upper mold plates through a plurality of adsorbers. The problem that an existing pitched roof parapet wall concrete pouring formwork cannot be stably and rapidly installed can be solved.
本发明公开了一种坡屋面女儿墙模架系统及施工方法,包括底模架、主力架和上悬模架,所述的主力架设置在底模架的一侧,上悬模架设置在底模架的上方,且与主力架的上端相连,所述的底模架包括支撑座和安装在所述支撑座上端的若干底模板,所述的主力架包括至少两根并排竖向设置的主力杆和用于连接主力杆的连接横杆,所述的上悬模架包括与对应的主力杆的上端相连的水平悬杆和与对应的水平悬杆相连的倾斜悬杆,所述的倾斜悬杆与水平悬杆呈交叉设置,且两个相对的夹角处安装有限位横杆,所述的倾斜悬杆延伸至底模板的上方且倾斜悬杆的下侧通过若干吸附器连接有若干上模板。本发明可以解决现在坡屋面女儿墙混凝土浇筑模板无法稳定快速安装的问题。
Pitched roof parapet wall formwork system and construction method
一种坡屋面女儿墙模架系统及施工方法
LIU XIAOGUANG (Autor:in) / SHI JINGZHAO (Autor:in) / HUANG YONGFENG (Autor:in) / LUO DEJIE (Autor:in) / LIU LIAOFAN (Autor:in)
09.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pitched roof formwork supporting device and construction method
Europäisches Patentamt | 2024
|Roof parapet wall prefabricated flashing construction method