Formwork erecting method for parapet wall
A formwork erecting method for a parapet wall is characterized by comprising the following steps that a, after positioning and paying-off are conducted, a formwork (4) is placed at a preset position, b, square timbers (3) are horizontally connected and placed in a full-length mode, c, back ridges are firmly fixed to the upper portion, the middle portion and the lower portion of the formwork (4) through opposite-pull screws (2), d, a plurality of inclined supporting rods (5) are arranged on the formwork (4), e, concrete is poured on a roof, and f, after the concrete is cured to reach the strength, the formwork (4) is erected on the formwork (4). And the formwork (4) and the steel pipe (1) are removed, and redundant phi 18 mm waste steel bars are cut off. The formwork erecting method for the parapet wall has the advantages that the two waste reinforcing steel bars on the construction site are used, perpendicularly welded and inserted into the steel pipes to form an inclined strut system, firmness and durability are achieved, the parapet wall and a roof floor can be poured together, the construction period is shortened, and construction operation is easy.
一种女儿墙的支模方法,其特征在于包括以下步骤:a、定位放线后,将模板(4)放置在预定位置,b、将方木(3)水平连接通长放置,c、用对拉螺杆(2)将背楞在模板(4)上、中、下部进行固定牢靠,d、对模板(4)设置若干斜撑杆(5),e、屋面浇筑混凝土,f、混凝土养护到强度后,拆除模板(4)及钢管(1),将多余Φ18mm废钢筋切除。本发明的女儿墙的支模方法具有使用两根工地废弃钢筋,相互垂直焊接,插入钢管中,形成的斜撑体系,牢固耐用,使女儿墙可以和屋面楼板一同浇筑,节约工期和施工操作简单的优点。
Formwork erecting method for parapet wall
A formwork erecting method for a parapet wall is characterized by comprising the following steps that a, after positioning and paying-off are conducted, a formwork (4) is placed at a preset position, b, square timbers (3) are horizontally connected and placed in a full-length mode, c, back ridges are firmly fixed to the upper portion, the middle portion and the lower portion of the formwork (4) through opposite-pull screws (2), d, a plurality of inclined supporting rods (5) are arranged on the formwork (4), e, concrete is poured on a roof, and f, after the concrete is cured to reach the strength, the formwork (4) is erected on the formwork (4). And the formwork (4) and the steel pipe (1) are removed, and redundant phi 18 mm waste steel bars are cut off. The formwork erecting method for the parapet wall has the advantages that the two waste reinforcing steel bars on the construction site are used, perpendicularly welded and inserted into the steel pipes to form an inclined strut system, firmness and durability are achieved, the parapet wall and a roof floor can be poured together, the construction period is shortened, and construction operation is easy.
一种女儿墙的支模方法,其特征在于包括以下步骤:a、定位放线后,将模板(4)放置在预定位置,b、将方木(3)水平连接通长放置,c、用对拉螺杆(2)将背楞在模板(4)上、中、下部进行固定牢靠,d、对模板(4)设置若干斜撑杆(5),e、屋面浇筑混凝土,f、混凝土养护到强度后,拆除模板(4)及钢管(1),将多余Φ18mm废钢筋切除。本发明的女儿墙的支模方法具有使用两根工地废弃钢筋,相互垂直焊接,插入钢管中,形成的斜撑体系,牢固耐用,使女儿墙可以和屋面楼板一同浇筑,节约工期和施工操作简单的优点。
Formwork erecting method for parapet wall
一种女儿墙的支模方法
ZHANG SHUCONG (Autor:in) / LIU FENGMAO (Autor:in) / SHEN SHUWEI (Autor:in) / HUANG LEI (Autor:in) / ZHAO HUIHUI (Autor:in)
02.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Wall single-side formwork erecting device and formwork erecting method
Europäisches Patentamt | 2022
|Pitched roof parapet wall formwork system and construction method
Europäisches Patentamt | 2024
|Formwork-free integrated rapid construction method for gutter parapet wall
Europäisches Patentamt | 2024
|