Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Temporary consolidation device for pier beam
The invention discloses a pier beam temporary consolidation device which comprises connecting ribs embedded in beam blocks, the connecting ribs are exposed out of the side faces of the beam blocks, a connecting piece is arranged on one sides of the two butt-jointed beam blocks, and the connecting piece comprises two connecting blocks and a connecting rod arranged between the two connecting blocks. The two ends of the connecting rod are fixedly connected to the two connecting blocks respectively, the connecting ribs on the same side of the two butt-jointed beam blocks penetrate through the two connecting blocks respectively, the connecting blocks are arranged on the connecting ribs in a sliding mode, vertical holes are formed in the connecting ribs and located in the sides, away from the beam blocks, of the connecting blocks, and pins are inserted into the vertical holes. The temporary consolidation device has the effect that the temporary consolidation device can be conveniently dismantled after beam block closure is completed.
本发明公开了一种墩梁临时固结装置,包括预埋于梁块上的连接筋,连接筋外漏于梁块的侧面,相对接的两个梁块的一侧设置有连接件,连接件包括两个连接块和设置于两个连接块之间的连接杆,连接杆的两端分别固定连接于两个连接块上,相对接的两个梁块同侧的连接筋分别穿过两个连接块,连接块滑动设置于连接筋上,连接筋上开设有竖向孔,竖向孔位于连接块远离梁块的一侧,竖向孔内插设有销钉。本申请具有便于在梁块合龙完成后对临时固结装置进行拆除的效果。
Temporary consolidation device for pier beam
The invention discloses a pier beam temporary consolidation device which comprises connecting ribs embedded in beam blocks, the connecting ribs are exposed out of the side faces of the beam blocks, a connecting piece is arranged on one sides of the two butt-jointed beam blocks, and the connecting piece comprises two connecting blocks and a connecting rod arranged between the two connecting blocks. The two ends of the connecting rod are fixedly connected to the two connecting blocks respectively, the connecting ribs on the same side of the two butt-jointed beam blocks penetrate through the two connecting blocks respectively, the connecting blocks are arranged on the connecting ribs in a sliding mode, vertical holes are formed in the connecting ribs and located in the sides, away from the beam blocks, of the connecting blocks, and pins are inserted into the vertical holes. The temporary consolidation device has the effect that the temporary consolidation device can be conveniently dismantled after beam block closure is completed.
本发明公开了一种墩梁临时固结装置,包括预埋于梁块上的连接筋,连接筋外漏于梁块的侧面,相对接的两个梁块的一侧设置有连接件,连接件包括两个连接块和设置于两个连接块之间的连接杆,连接杆的两端分别固定连接于两个连接块上,相对接的两个梁块同侧的连接筋分别穿过两个连接块,连接块滑动设置于连接筋上,连接筋上开设有竖向孔,竖向孔位于连接块远离梁块的一侧,竖向孔内插设有销钉。本申请具有便于在梁块合龙完成后对临时固结装置进行拆除的效果。
Temporary consolidation device for pier beam
一种墩梁临时固结装置
ZHANG BOYAN (Autor:in) / ZHOU YANG (Autor:in) / ZHAO LIANG (Autor:in) / YANG DONG (Autor:in) / YIN CHEN (Autor:in) / YU YONGFENG (Autor:in) / YANG QI (Autor:in) / RAO PINBIAO (Autor:in) / GU SHILEI (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Temporary consolidation construction method for pier top
Europäisches Patentamt | 2022
|Prefabricated post-consolidation pier beam construction method and pier beam structure
Europäisches Patentamt | 2022
|Temporary pier construction method and temporary pier
Europäisches Patentamt | 2024
|Pier beam consolidation connection structure and repairing device
Europäisches Patentamt | 2024
|