Bridge deck construction method for large-span highway-railway dual-purpose steel truss girder bridge
The invention discloses a bridge floor construction method for a large-span highway-railway dual-purpose steel truss girder bridge. The bridge floor construction method comprises the following steps that S1, skip pouring is conducted on a positive bending moment area of a highway bridge floor on the steel truss girder bridge after closure is completed; the skip bay pouring is divided into a preset number of batches, each batch is symmetrically and simultaneously carried out in the direction from the side span to the middle span, and each batch is spaced by a preset time length; s2, construction of a lower-layer railway bridge deck is conducted; s3, carrying out preloading with preset weight on the side span of the bridge; s4, concrete pouring of the negative moment area of the highway bridge floor is conducted, and bridge floor pouring closure is completed; s5, unloading the heaped load of the bridge side span; and construction of the highway-railway dual-purpose bridge deck is completed. By means of the method, the shrinkage effect in concrete bridge deck construction can be improved.
本发明公开了一种用于大跨度公铁两用钢桁梁桥的桥面施工方法,包括以下步骤:S1、在合龙完成的钢桁梁桥上对公路桥面正弯矩区进行跳仓浇筑;所述跳仓浇筑分为预设数量个批次,每个批次均对称地从边跨向中跨方向同时进行,每个批次间隔预设时长;S2、进行下层铁路桥面的施工;S3、在桥梁边跨进行预设重量的堆载;S4、进行公路桥面负弯矩区的混凝土浇筑,完成桥面浇筑合龙;S5、卸载桥梁边跨的所述堆载;完成公铁两用桥面的施工。本发明的方法能够改善混凝土桥面板施工中的收缩效应。
Bridge deck construction method for large-span highway-railway dual-purpose steel truss girder bridge
The invention discloses a bridge floor construction method for a large-span highway-railway dual-purpose steel truss girder bridge. The bridge floor construction method comprises the following steps that S1, skip pouring is conducted on a positive bending moment area of a highway bridge floor on the steel truss girder bridge after closure is completed; the skip bay pouring is divided into a preset number of batches, each batch is symmetrically and simultaneously carried out in the direction from the side span to the middle span, and each batch is spaced by a preset time length; s2, construction of a lower-layer railway bridge deck is conducted; s3, carrying out preloading with preset weight on the side span of the bridge; s4, concrete pouring of the negative moment area of the highway bridge floor is conducted, and bridge floor pouring closure is completed; s5, unloading the heaped load of the bridge side span; and construction of the highway-railway dual-purpose bridge deck is completed. By means of the method, the shrinkage effect in concrete bridge deck construction can be improved.
本发明公开了一种用于大跨度公铁两用钢桁梁桥的桥面施工方法,包括以下步骤:S1、在合龙完成的钢桁梁桥上对公路桥面正弯矩区进行跳仓浇筑;所述跳仓浇筑分为预设数量个批次,每个批次均对称地从边跨向中跨方向同时进行,每个批次间隔预设时长;S2、进行下层铁路桥面的施工;S3、在桥梁边跨进行预设重量的堆载;S4、进行公路桥面负弯矩区的混凝土浇筑,完成桥面浇筑合龙;S5、卸载桥梁边跨的所述堆载;完成公铁两用桥面的施工。本发明的方法能够改善混凝土桥面板施工中的收缩效应。
Bridge deck construction method for large-span highway-railway dual-purpose steel truss girder bridge
一种用于大跨度公铁两用钢桁梁桥的桥面施工方法
PENG PENG (Autor:in) / ZHOU WEI (Autor:in) / XIE YIPING (Autor:in) / DENG SHUAI (Autor:in) / ZHANG NIJIN (Autor:in) / ZENG HUIPING (Autor:in) / LUO JIANPING (Autor:in) / LIU JUN (Autor:in) / OU LIN (Autor:in) / CHEN ZHI (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Highway bridge deck construction method of highway-railway dual-purpose bridge
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|