Construction method of basement constructed through reverse building method
The invention relates to the technical field of building construction, in particular to a construction method for constructing a basement through a reverse construction method. The method mainly comprises the steps that according to construction drawings and construction requirements, marking and partitioning are conducted on a foundation pit to be excavated, a construction area is divided into a reverse construction area and a consequent construction area, then according to the divided reverse construction area and consequent construction area, foundation pit excavation and basement structure beam and slab construction of the consequent construction area are conducted firstly, and construction of the consequent construction area is completed; a pit separation pile is constructed between the forward construction area and the reverse construction area for separation; after the sequential construction area construction is completed, the reverse construction area construction is started; during construction of a reverse construction area, excavating earthwork layer by layer and pouring a structural floor slab by adopting a reverse construction method until pouring of a basement bottom plate is completed; when earthwork is excavated, a first soil taking opening is formed in the top of the reverse construction area, lateral soil outlets are formed in the pit dividing piles towards the sequential construction area layer by layer, and soil cutting, soil discharging and construction material transportation operation are conducted at the first soil taking opening and the lateral soil outlets through machines. The construction cost is low, and the earth cutting speed of the reverse construction area can be greatly increased.
本发明涉及建筑施工技术领域,具体涉及一种逆作法施工地下室的施工方法。主要包括根据施工图纸和施工要求,在待开挖基坑进行划线分区,将施工区域划分为逆作区和顺做区,再根据划分的逆作区和顺做区,首先进行顺做区的基坑开挖和地下室结构梁板施工,以完成顺做区施工,且顺做区与逆作区之间施工分坑桩进行隔开;完成顺做区施工后,开始进行逆作区施工;逆作区施工时,采用逆作法逐层开挖土方和浇筑结构楼板,直至完成地下室底板浇筑;开挖土方时,在逆作区顶部开设第一取土口和逐层在分坑桩朝顺做区开设侧向出土口,通过在第一取土口和侧向出土口采用机械进行挖土、出土和施工材料运输作业。本发明施工成本低、能够大幅提高逆作区挖土速度。
Construction method of basement constructed through reverse building method
The invention relates to the technical field of building construction, in particular to a construction method for constructing a basement through a reverse construction method. The method mainly comprises the steps that according to construction drawings and construction requirements, marking and partitioning are conducted on a foundation pit to be excavated, a construction area is divided into a reverse construction area and a consequent construction area, then according to the divided reverse construction area and consequent construction area, foundation pit excavation and basement structure beam and slab construction of the consequent construction area are conducted firstly, and construction of the consequent construction area is completed; a pit separation pile is constructed between the forward construction area and the reverse construction area for separation; after the sequential construction area construction is completed, the reverse construction area construction is started; during construction of a reverse construction area, excavating earthwork layer by layer and pouring a structural floor slab by adopting a reverse construction method until pouring of a basement bottom plate is completed; when earthwork is excavated, a first soil taking opening is formed in the top of the reverse construction area, lateral soil outlets are formed in the pit dividing piles towards the sequential construction area layer by layer, and soil cutting, soil discharging and construction material transportation operation are conducted at the first soil taking opening and the lateral soil outlets through machines. The construction cost is low, and the earth cutting speed of the reverse construction area can be greatly increased.
本发明涉及建筑施工技术领域,具体涉及一种逆作法施工地下室的施工方法。主要包括根据施工图纸和施工要求,在待开挖基坑进行划线分区,将施工区域划分为逆作区和顺做区,再根据划分的逆作区和顺做区,首先进行顺做区的基坑开挖和地下室结构梁板施工,以完成顺做区施工,且顺做区与逆作区之间施工分坑桩进行隔开;完成顺做区施工后,开始进行逆作区施工;逆作区施工时,采用逆作法逐层开挖土方和浇筑结构楼板,直至完成地下室底板浇筑;开挖土方时,在逆作区顶部开设第一取土口和逐层在分坑桩朝顺做区开设侧向出土口,通过在第一取土口和侧向出土口采用机械进行挖土、出土和施工材料运输作业。本发明施工成本低、能够大幅提高逆作区挖土速度。
Construction method of basement constructed through reverse building method
一种逆作法施工地下室的施工方法
WANG MAO (Autor:in) / ZHU SUJUN (Autor:in) / SHEN LIHUA (Autor:in) / WANG XIONGFEI (Autor:in) / XU YI (Autor:in) / GUO BINGQING (Autor:in) / ZHANG JIALI (Autor:in) / CAI CHENGKUN (Autor:in) / CHENG FENG (Autor:in) / WEI CONGHAO (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reverse-construction-method basement construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Basement earth excavation method adopting reverse construction method
Europäisches Patentamt | 2015
|Basement border area reverse construction method lining wall construction method
Europäisches Patentamt | 2021
|Short formwork method in basement structure reverse construction
Europäisches Patentamt | 2021
|