Construction method of underground traction substation integrally constructed with civil building basement
The invention relates to the technical field of underground traction substations, and provides a construction method of an underground traction substation integrally constructed with a civil building basement, which is used for integrally constructing with the civil building basement, and comprises the following steps: S1, opening up an independent space underground, and constructing the independent space depending on the civil building basement; s2, arranging a traction substation in the independent space; and S3, the outer edge of the independent space is isolated from the civil building basement through a double-layer reinforced concrete wall. According to the construction method of the underground traction substation integrally constructed with the civil building basement, the underground traction substation is jointly constructed with the civil building basement, and the problems that land resources are insufficient and addressing is difficult are solved.
本发明涉及地下牵引变电所技术领域,提供了一种与民用建筑地下室一体化建设的地下牵引变电所建造方法,用于与民用建筑地下室一体化建设,包括如下步骤:S1,于地下开辟一个独立空间,所述独立空间依靠于所述民用建筑地下室建设;S2,在所述独立空间中布置牵引变电所;S3,在所述独立空间的外缘采用双层钢筋砼墙体与所述民用建筑地下室隔离。本发明的一种与民用建筑地下室一体化建设的地下牵引变电所建造方法,通过与民用建筑地下室合建,解决了土地资源紧张寻址困难的问题。
Construction method of underground traction substation integrally constructed with civil building basement
The invention relates to the technical field of underground traction substations, and provides a construction method of an underground traction substation integrally constructed with a civil building basement, which is used for integrally constructing with the civil building basement, and comprises the following steps: S1, opening up an independent space underground, and constructing the independent space depending on the civil building basement; s2, arranging a traction substation in the independent space; and S3, the outer edge of the independent space is isolated from the civil building basement through a double-layer reinforced concrete wall. According to the construction method of the underground traction substation integrally constructed with the civil building basement, the underground traction substation is jointly constructed with the civil building basement, and the problems that land resources are insufficient and addressing is difficult are solved.
本发明涉及地下牵引变电所技术领域,提供了一种与民用建筑地下室一体化建设的地下牵引变电所建造方法,用于与民用建筑地下室一体化建设,包括如下步骤:S1,于地下开辟一个独立空间,所述独立空间依靠于所述民用建筑地下室建设;S2,在所述独立空间中布置牵引变电所;S3,在所述独立空间的外缘采用双层钢筋砼墙体与所述民用建筑地下室隔离。本发明的一种与民用建筑地下室一体化建设的地下牵引变电所建造方法,通过与民用建筑地下室合建,解决了土地资源紧张寻址困难的问题。
Construction method of underground traction substation integrally constructed with civil building basement
与民用建筑地下室一体化建设的地下牵引变电所建造方法
HUANG PENG (Autor:in) / WEN PENG (Autor:in) / DENG BO (Autor:in) / WANG LIN (Autor:in) / LI WENSHENG (Autor:in) / XU XUBAO (Autor:in) / GONG JINGANG (Autor:in) / FAN HONGYU (Autor:in) / MA YUNLIANG (Autor:in) / LYU JIAYUE (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
H02B
BOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
,
Schalttafeln, Unterstationen oder Schaltanordnungen für die Abgabe oder Verteilung elektrischer Energie
Construction method of basement constructed through reverse building method