Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Emery terrace elevation control device and use method thereof
The invention relates to the technical field of floor elevation control, and discloses a carborundum floor elevation control device and a using method thereof.The carborundum floor elevation control device comprises a supporting plate, the top of the supporting plate is fixedly connected with a fixing plate, and the bottom of the supporting plate is fixedly connected with a first connecting plate. Specifically, a second connecting plate can drive a sliding sleeve to slide on a first fixing rod through a third connecting plate in the moving process, the sliding sleeve can drive a screen to slide front and back, the screen can screen out and collect large aggregate on the surface of the concrete terrace in the advancing process of the trolley, small aggregate can pass through the screen, and the aggregate on the surface of the concrete terrace can be recycled. By means of the design, protruding large-particle aggregate on the surface of concrete can be screened out, concave traces are prevented from being left on the surface of the concrete after the scraper is in contact with the aggregate, the flatness of a floor is prevented from being affected, the concrete can be disturbed in advance through reciprocating motion of the screen, the concrete is evenly mixed, meanwhile, upper-layer concrete can be prevented from being condensed together in advance, and the service life of the floor is prolonged. And the normal operation of the leveling work is prevented.
本发明涉及地坪标高控制技术领域,且公开了一种金刚砂地坪标高控制装置及其使用方法,包括支撑板,支撑板顶部固定连接有固定板,支撑板底部固定连接有连接板一,本发明通过设置筛料机构,具体是连接板二在移动的过程中还会通过连接板三带动滑动套在固定杆一上滑动,滑动套会带动筛网进行前后滑动,小车前进过程中筛网会将混凝土地坪表面较大的骨料筛出并进行收集,较小的骨料会通过筛网,此种设计可将混凝土表面有突出的大颗粒骨料筛出,防止在刮板与骨料接触后,在混凝土表面留下凹陷的痕迹,影响地坪平整度,且通过筛网的往复运动,可提前将混凝土扰乱,使混凝土混合均匀的同时,还可防止上层混凝土提前凝结在一起,阻止整平工作的正常进行。
Emery terrace elevation control device and use method thereof
The invention relates to the technical field of floor elevation control, and discloses a carborundum floor elevation control device and a using method thereof.The carborundum floor elevation control device comprises a supporting plate, the top of the supporting plate is fixedly connected with a fixing plate, and the bottom of the supporting plate is fixedly connected with a first connecting plate. Specifically, a second connecting plate can drive a sliding sleeve to slide on a first fixing rod through a third connecting plate in the moving process, the sliding sleeve can drive a screen to slide front and back, the screen can screen out and collect large aggregate on the surface of the concrete terrace in the advancing process of the trolley, small aggregate can pass through the screen, and the aggregate on the surface of the concrete terrace can be recycled. By means of the design, protruding large-particle aggregate on the surface of concrete can be screened out, concave traces are prevented from being left on the surface of the concrete after the scraper is in contact with the aggregate, the flatness of a floor is prevented from being affected, the concrete can be disturbed in advance through reciprocating motion of the screen, the concrete is evenly mixed, meanwhile, upper-layer concrete can be prevented from being condensed together in advance, and the service life of the floor is prolonged. And the normal operation of the leveling work is prevented.
本发明涉及地坪标高控制技术领域,且公开了一种金刚砂地坪标高控制装置及其使用方法,包括支撑板,支撑板顶部固定连接有固定板,支撑板底部固定连接有连接板一,本发明通过设置筛料机构,具体是连接板二在移动的过程中还会通过连接板三带动滑动套在固定杆一上滑动,滑动套会带动筛网进行前后滑动,小车前进过程中筛网会将混凝土地坪表面较大的骨料筛出并进行收集,较小的骨料会通过筛网,此种设计可将混凝土表面有突出的大颗粒骨料筛出,防止在刮板与骨料接触后,在混凝土表面留下凹陷的痕迹,影响地坪平整度,且通过筛网的往复运动,可提前将混凝土扰乱,使混凝土混合均匀的同时,还可防止上层混凝土提前凝结在一起,阻止整平工作的正常进行。
Emery terrace elevation control device and use method thereof
一种金刚砂地坪标高控制装置及其使用方法
RAO WUBIN (Autor:in) / YANG RUIPENG (Autor:in) / CHEN YUGEN (Autor:in) / SUN DECHANG (Autor:in)
12.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
B07B
Trennen fester Stoffe von festen Stoffen durch Sieben, Klassieren oder Sichten oder durch Verwendung von Gasströmungen
,
SEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, OR SIFTING OR BY USING GAS CURRENTS
Fast distance-determining elevation control device for terrace construction
Europäisches Patentamt | 2021
|Self-leveling master batch for emery terrace and preparation method of self-leveling master batch
Europäisches Patentamt | 2024
|Terrace coating, preparation method thereof and terrace plate
Europäisches Patentamt | 2020
|Terrace adjustable device and terrace leveling method
Europäisches Patentamt | 2023
|