High-pile wharf structure suitable for earthquake frequent occurrence area and construction method
The high-pile wharf structure comprises a plurality of steel pipe piles, the steel pipe piles are vertically inserted into an underwater stratum at intervals, conical hoppers are installed at the top ends of the other steel pipe piles except the row of steel pipe piles close to the seaside berthing position, and pile core reinforcement cages are vertically and coaxially arranged in the steel pipe piles; the plurality of trapezoidal plates are horizontally arranged at intervals, the trapezoidal plates are formed by arranging filler on the inner side of a formwork during prefabrication and pouring concrete, holes are formed in the formwork and used for allowing internal steel bars to extend out, and the four corners of the outer side of each trapezoidal plate are each in an inwards-sunken arc shape; one trapezoidal plate is placed on the four conical hoppers at the same time and serves as a cross beam and longitudinal beam pouring formwork; the pile core and the transverse and longitudinal beams of the high-pile wharf are poured at a time, the pouring frequency of an operation site is reduced, the construction efficiency is improved, and the structure has a good anti-seismic effect.
本发明公开了一种适用于地震频发区的高桩码头结构,包括:多个钢管桩,分别间隔竖直插入水下地层,靠近海侧靠泊位的一排钢管桩之外的其它所述钢管桩顶端均安装锥形斗,钢管桩内竖向同轴设置有桩芯钢筋笼;多个梯形板,水平间隔设置,所述梯形板在预制时模板内侧设置填充物浇筑混凝土形成,并在模板开孔,用于内部钢筋伸出,所述梯形板外侧的四个角均为向内凹陷的弧形;一个梯形板同时放置在四个锥形斗上并用作横梁、纵梁浇筑模板;本发明高桩码头桩芯、横纵梁一次性浇筑,减少作业现场的浇筑频次,提高施工效率,结构对抗震具有较好效果。
High-pile wharf structure suitable for earthquake frequent occurrence area and construction method
The high-pile wharf structure comprises a plurality of steel pipe piles, the steel pipe piles are vertically inserted into an underwater stratum at intervals, conical hoppers are installed at the top ends of the other steel pipe piles except the row of steel pipe piles close to the seaside berthing position, and pile core reinforcement cages are vertically and coaxially arranged in the steel pipe piles; the plurality of trapezoidal plates are horizontally arranged at intervals, the trapezoidal plates are formed by arranging filler on the inner side of a formwork during prefabrication and pouring concrete, holes are formed in the formwork and used for allowing internal steel bars to extend out, and the four corners of the outer side of each trapezoidal plate are each in an inwards-sunken arc shape; one trapezoidal plate is placed on the four conical hoppers at the same time and serves as a cross beam and longitudinal beam pouring formwork; the pile core and the transverse and longitudinal beams of the high-pile wharf are poured at a time, the pouring frequency of an operation site is reduced, the construction efficiency is improved, and the structure has a good anti-seismic effect.
本发明公开了一种适用于地震频发区的高桩码头结构,包括:多个钢管桩,分别间隔竖直插入水下地层,靠近海侧靠泊位的一排钢管桩之外的其它所述钢管桩顶端均安装锥形斗,钢管桩内竖向同轴设置有桩芯钢筋笼;多个梯形板,水平间隔设置,所述梯形板在预制时模板内侧设置填充物浇筑混凝土形成,并在模板开孔,用于内部钢筋伸出,所述梯形板外侧的四个角均为向内凹陷的弧形;一个梯形板同时放置在四个锥形斗上并用作横梁、纵梁浇筑模板;本发明高桩码头桩芯、横纵梁一次性浇筑,减少作业现场的浇筑频次,提高施工效率,结构对抗震具有较好效果。
High-pile wharf structure suitable for earthquake frequent occurrence area and construction method
一种适用于地震频发区的高桩码头结构及施工方法
SHI SHAOZHI (Autor:in) / CHENG DUOYUN (Autor:in) / FENG XIANDAO (Autor:in) / HE CONG (Autor:in) / SUN RENSONG (Autor:in) / LIN HONGXING (Autor:in) / LYU SHILIN (Autor:in) / SHEN LILONG (Autor:in) / LIU CONGCONG (Autor:in)
16.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Full-straight pile wharf suitable for deepwater port construction
Europäisches Patentamt | 2021
|