Concrete pipe gallery frame construction method
The invention provides a construction method of a concrete pipe gallery frame. The construction method comprises the steps that prefabricated parts are machined; mounting the foundation pillars: arranging a mounting cup opening on the base, adjusting the axis of the mounting cup opening to be vertical, performing concrete leveling on the inner bottom surface of the mounting cup opening, hoisting one foundation pillar and adjusting the axis of the foundation pillar to be superposed with the axis of the mounting cup opening, then clamping the foundation pillar in the mounting cup opening by using a wooden wedge, and repeating the operation to mount the other base and the foundation pillar; then, concrete grouting is conducted in the mounting cup opening; connecting columns are installed, wherein the two connecting columns and the two cross beams are combined into a whole; the two jacking columns and the two cross beams are combined into a whole, and then the whole is hoisted so that the bottom ends of the jacking columns can be in butt joint with the top ends of the connecting columns. The problems that in the prior art, a concrete pipe gallery frame is long in construction period and high in overall construction cost are solved.
本发明提供了一种混凝土管廊架施工方法,其包括:预制件加工;基柱安装:基座上设置有安装杯口,调整安装杯口轴线垂直,对安装杯口内底面进行混凝土找平,吊入一个基柱并调整基柱轴线与安装杯口轴线重合,然后使用木楔卡紧安装杯口内的基柱,重复作业安装另一基座和基柱,然后在安装杯口内进行混凝土灌浆;连接柱安装:两个连接柱和两个横梁组合成整体;顶柱安装:两个顶柱和两个横梁组合成整体,然后吊起整体后使得顶柱的底端与连接柱的顶端对接。本发明解决了现有技术中混凝土管廊架施工周期长、整体建设成本高的问题。
Concrete pipe gallery frame construction method
The invention provides a construction method of a concrete pipe gallery frame. The construction method comprises the steps that prefabricated parts are machined; mounting the foundation pillars: arranging a mounting cup opening on the base, adjusting the axis of the mounting cup opening to be vertical, performing concrete leveling on the inner bottom surface of the mounting cup opening, hoisting one foundation pillar and adjusting the axis of the foundation pillar to be superposed with the axis of the mounting cup opening, then clamping the foundation pillar in the mounting cup opening by using a wooden wedge, and repeating the operation to mount the other base and the foundation pillar; then, concrete grouting is conducted in the mounting cup opening; connecting columns are installed, wherein the two connecting columns and the two cross beams are combined into a whole; the two jacking columns and the two cross beams are combined into a whole, and then the whole is hoisted so that the bottom ends of the jacking columns can be in butt joint with the top ends of the connecting columns. The problems that in the prior art, a concrete pipe gallery frame is long in construction period and high in overall construction cost are solved.
本发明提供了一种混凝土管廊架施工方法,其包括:预制件加工;基柱安装:基座上设置有安装杯口,调整安装杯口轴线垂直,对安装杯口内底面进行混凝土找平,吊入一个基柱并调整基柱轴线与安装杯口轴线重合,然后使用木楔卡紧安装杯口内的基柱,重复作业安装另一基座和基柱,然后在安装杯口内进行混凝土灌浆;连接柱安装:两个连接柱和两个横梁组合成整体;顶柱安装:两个顶柱和两个横梁组合成整体,然后吊起整体后使得顶柱的底端与连接柱的顶端对接。本发明解决了现有技术中混凝土管廊架施工周期长、整体建设成本高的问题。
Concrete pipe gallery frame construction method
一种混凝土管廊架施工方法
HU SHUI (Autor:in) / ZOU QILE (Autor:in) / CHEN WANWAN (Autor:in) / ZHANG WEN (Autor:in) / FU LI (Autor:in) / HU JINLI (Autor:in) / LU BINGXIANG (Autor:in) / ZHU ZHONGKAI (Autor:in) / WU JIAXU (Autor:in) / XIAO WEI (Autor:in)
23.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Disc buckle type supporting frame for pipe gallery construction and construction method
Europäisches Patentamt | 2021
|