Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Riverbed underneath-penetrating comprehensive pipe gallery structure and construction method thereof
The invention relates to a riverbed-underneath-penetrating comprehensive pipe gallery structure and a construction method thereof, and belongs to the technical field of underground comprehensive pipe galleries, the riverbed-underneath-penetrating comprehensive pipe gallery structure comprises a gallery body, a plurality of rotating rods are rotationally arranged at the top of the gallery body, and the rotating axes of the rotating rods are parallel to the width direction of a riverbed; the multiple rotating rods are arranged in the length direction of the corridor body at intervals, multiple stirring blades are arranged in the circumferential direction of the rotating rods and used for abutting against silt on the top of the corridor body, and the corridor body is provided with rotating pieces used for driving the rotating rods to rotate. The structure has the effects of reducing silt accumulated at the top of the corridor body and ensuring the safety of the corridor body structure to a certain extent.
本申请涉及一种下穿河床综合管廊结构及其施工方法,属于地下综合管廊技术领域,下穿河床综合管廊结构包括廊体,所述廊体顶部转动设置有多个转杆,所述转杆的转动轴线平行于河床的宽度方向,多个所述转杆沿廊体的长度方向间隔排列,沿所述转杆的周向设置有多个搅动叶,所述搅动叶用于与廊体顶部的泥沙抵接,所述廊体设置有用于驱使转杆转动的转动件。本申请具有减少廊体顶部积聚的泥沙,一定程度上保证廊体结构安全的效果。
Riverbed underneath-penetrating comprehensive pipe gallery structure and construction method thereof
The invention relates to a riverbed-underneath-penetrating comprehensive pipe gallery structure and a construction method thereof, and belongs to the technical field of underground comprehensive pipe galleries, the riverbed-underneath-penetrating comprehensive pipe gallery structure comprises a gallery body, a plurality of rotating rods are rotationally arranged at the top of the gallery body, and the rotating axes of the rotating rods are parallel to the width direction of a riverbed; the multiple rotating rods are arranged in the length direction of the corridor body at intervals, multiple stirring blades are arranged in the circumferential direction of the rotating rods and used for abutting against silt on the top of the corridor body, and the corridor body is provided with rotating pieces used for driving the rotating rods to rotate. The structure has the effects of reducing silt accumulated at the top of the corridor body and ensuring the safety of the corridor body structure to a certain extent.
本申请涉及一种下穿河床综合管廊结构及其施工方法,属于地下综合管廊技术领域,下穿河床综合管廊结构包括廊体,所述廊体顶部转动设置有多个转杆,所述转杆的转动轴线平行于河床的宽度方向,多个所述转杆沿廊体的长度方向间隔排列,沿所述转杆的周向设置有多个搅动叶,所述搅动叶用于与廊体顶部的泥沙抵接,所述廊体设置有用于驱使转杆转动的转动件。本申请具有减少廊体顶部积聚的泥沙,一定程度上保证廊体结构安全的效果。
Riverbed underneath-penetrating comprehensive pipe gallery structure and construction method thereof
一种下穿河床综合管廊结构及其施工方法
YANG YUANHANG (Autor:in) / LIAO PINGDONG (Autor:in) / GUO CHUN (Autor:in) / PENG MIN (Autor:in) / DING CONG (Autor:in)
26.07.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Vibration reduction and reinforcement structure of pipe gallery construction underneath pass road
Europäisches Patentamt | 2024
|Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|