Earthquake simulation vibration table concrete foundation construction method
The invention discloses a construction method for an open box type concrete foundation of an earthquake simulation vibration table. The construction method comprises the following steps: step 1, construction preparation; step 2, constructing a first-layer foundation structure; 3, horizontal and vertical actuator connecting piece modules enter the field for acceptance; 4, mounting, debugging and fixing the vertical actuator connecting piece module; 5, constructing a second-layer foundation structure; step 6, constructing a third-layer foundation structure; 7, installing, debugging and fixing the horizontal actuator connecting piece module; and step 8, constructing a fourth-layer foundation structure. Layered construction of the mass concrete foundation is adopted, vertical actuator connecting piece and horizontal actuator connecting piece module assemblies are transported to the site to be assembled, overall debugging and mounting are conducted, and the problem that mass concrete is prone to cracking is solved.
本发明公开了了一种地震模拟振动台开口箱型混凝土基础施工方法,包括以下步骤进行:步骤1、施工准备;步骤2、第一层基础结构施工;步骤3、水平、竖向作动器连接件模块进场验收;步骤4、竖向作动器连接件模块安装调试固定;步骤5、第二层基础结构施工;步骤6、第三层基础结构施工;步骤7、水平作动器连接件模块安装调试固定;步骤8、第四层基础结构施工。本发明采用大体积混凝土基础分层施工,竖向作动器连接件及水平作动器连接件模块组件,运至现场进行组装,整体调试安装,解决了大体积混凝土易出现裂缝问题。
Earthquake simulation vibration table concrete foundation construction method
The invention discloses a construction method for an open box type concrete foundation of an earthquake simulation vibration table. The construction method comprises the following steps: step 1, construction preparation; step 2, constructing a first-layer foundation structure; 3, horizontal and vertical actuator connecting piece modules enter the field for acceptance; 4, mounting, debugging and fixing the vertical actuator connecting piece module; 5, constructing a second-layer foundation structure; step 6, constructing a third-layer foundation structure; 7, installing, debugging and fixing the horizontal actuator connecting piece module; and step 8, constructing a fourth-layer foundation structure. Layered construction of the mass concrete foundation is adopted, vertical actuator connecting piece and horizontal actuator connecting piece module assemblies are transported to the site to be assembled, overall debugging and mounting are conducted, and the problem that mass concrete is prone to cracking is solved.
本发明公开了了一种地震模拟振动台开口箱型混凝土基础施工方法,包括以下步骤进行:步骤1、施工准备;步骤2、第一层基础结构施工;步骤3、水平、竖向作动器连接件模块进场验收;步骤4、竖向作动器连接件模块安装调试固定;步骤5、第二层基础结构施工;步骤6、第三层基础结构施工;步骤7、水平作动器连接件模块安装调试固定;步骤8、第四层基础结构施工。本发明采用大体积混凝土基础分层施工,竖向作动器连接件及水平作动器连接件模块组件,运至现场进行组装,整体调试安装,解决了大体积混凝土易出现裂缝问题。
Earthquake simulation vibration table concrete foundation construction method
一种地震模拟振动台混凝土基础施工方法
KANG JIANJUN (Autor:in) / HUANG ZHONGSEN (Autor:in) / WANG XIANGUI (Autor:in) / GAO JUN (Autor:in) / CHEN PEISHENG (Autor:in)
06.08.2024
Patent
Elektronische Ressource
Chinesisch
Vibrating table vibration reducing foundation structure and construction method thereof
Europäisches Patentamt | 2015
|Foundation bearing table for foundation pit construction and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Building vibration isolation foundation construction method
Europäisches Patentamt | 2021
|