Swivel continuous beam closure section construction system and construction method
The invention relates to a swivel continuous beam closure section construction system and method. The swivel continuous beam closure section construction system comprises an anchoring unit, a bottom bracing unit, a formwork unit, a transmission unit and a hydraulic unit. The swivel continuous beam comprises a bottom steel plate located at the bottom of the beam, and the bottom bracing unit is connected to the bottom of the bottom steel plate through a temporary supporting assembly. The anchoring unit comprises an anchoring beam located at the top of the beam, the formwork unit is supported on a side beam of the swivel continuous beam through the transmission unit and the hydraulic unit and used for adjusting the lateral supporting angle of the formwork unit relative to the side beam through the transmission unit and the hydraulic unit, and after the angle is adjusted in place, the formwork unit is fixedly connected with the side beam; the bottom bracing unit and the formwork unit are hinged to form an integral structure, a fixed pulley is installed on the anchoring beam, a steel wire rope is arranged on the fixed pulley and comprises a pulling end and a connecting end, and the connecting end is connected with the bottom bracing unit.
本申请涉及一种转体连续梁合龙段施工系统及施工方法,其中转体连续梁合龙段施工系统包括:锚固单元、底撑单元、模板单元、传动单元以及液压单元;转体连续梁包括位于梁底的底钢板,底撑单元通过临时支撑组件连接在底钢板的底部;锚固单元包括位于梁顶的锚固梁,模板单元通过传动单元以及液压单元支撑在转体连续梁的侧梁上,用于能够通过传动单元及液压单元调整模板单元相对侧梁的侧向支撑角度,角度调整到位后,模板单元与侧梁连接固定;底撑单元与模板单元铰接为整体结构,锚固梁上安装有定滑轮,定滑轮上设置有钢丝绳,钢丝绳包括拉拽端以及连接端,连接端与底撑单元连接。
Swivel continuous beam closure section construction system and construction method
The invention relates to a swivel continuous beam closure section construction system and method. The swivel continuous beam closure section construction system comprises an anchoring unit, a bottom bracing unit, a formwork unit, a transmission unit and a hydraulic unit. The swivel continuous beam comprises a bottom steel plate located at the bottom of the beam, and the bottom bracing unit is connected to the bottom of the bottom steel plate through a temporary supporting assembly. The anchoring unit comprises an anchoring beam located at the top of the beam, the formwork unit is supported on a side beam of the swivel continuous beam through the transmission unit and the hydraulic unit and used for adjusting the lateral supporting angle of the formwork unit relative to the side beam through the transmission unit and the hydraulic unit, and after the angle is adjusted in place, the formwork unit is fixedly connected with the side beam; the bottom bracing unit and the formwork unit are hinged to form an integral structure, a fixed pulley is installed on the anchoring beam, a steel wire rope is arranged on the fixed pulley and comprises a pulling end and a connecting end, and the connecting end is connected with the bottom bracing unit.
本申请涉及一种转体连续梁合龙段施工系统及施工方法,其中转体连续梁合龙段施工系统包括:锚固单元、底撑单元、模板单元、传动单元以及液压单元;转体连续梁包括位于梁底的底钢板,底撑单元通过临时支撑组件连接在底钢板的底部;锚固单元包括位于梁顶的锚固梁,模板单元通过传动单元以及液压单元支撑在转体连续梁的侧梁上,用于能够通过传动单元及液压单元调整模板单元相对侧梁的侧向支撑角度,角度调整到位后,模板单元与侧梁连接固定;底撑单元与模板单元铰接为整体结构,锚固梁上安装有定滑轮,定滑轮上设置有钢丝绳,钢丝绳包括拉拽端以及连接端,连接端与底撑单元连接。
Swivel continuous beam closure section construction system and construction method
一种转体连续梁合龙段施工系统及施工方法
WANG JUN (Autor:in) / LIAO FENG (Autor:in) / GONG MING (Autor:in) / HAN LIJUN (Autor:in) / BAO YONGSHENG (Autor:in) / TAN SHAOBO (Autor:in) / ZHANG CHANGLIANG (Autor:in) / LI RUYOU (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Swivel beam closure section structure and construction method thereof
Europäisches Patentamt | 2021
|Swivel bridge closure device and swivel bridge closure construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|BIM-based railway continuous beam swivel construction method
Europäisches Patentamt | 2020
|